My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> B . PROTECTION <br /> 1 . Trees moved by winch or crane shall be thoroughly protected from chain <br /> marks, girdling, or other bark slippage by means of burlap, wood battens or <br /> other approved method . <br /> 2 . Container grown plants shall be carefully removed from the container so as not <br /> to disturb the root system. Spade shall not be used to cut containers . <br /> 5 . JOB CONDITIONS <br /> A. EXISTING CONDITIONS <br /> 1 . The contractor shall verify all site conditions prior to construction . <br /> ' 2 . The Contractor shall exercise care in digging and other work so as not to <br /> damage existing work including underground pipes and cables, and the pipes <br /> and hydrants of watering systems . Should such overhead or underground <br /> obstructions be encountered which interfere with planting the location of plants <br /> shall be adjusted to clear such obstruction. <br /> 3 . Should any objectionable materials such as old concrete, bricks, or other debris <br /> be encountered during planting operations, they shall be removed from the site <br /> by the Contractor. <br /> B . SCHEDULING <br /> 1 . In general the work shall proceed as rapidly as the site becomes available. <br /> 2 . Landscape installation shall not begin until an adequate source of water is <br /> available on site. <br /> 3 . The Contractor shall be responsible for coordinating his work with all other <br /> parties involved with the job in order the eliminate unnecessary complication <br /> during the installation of his work. <br /> 4 . Upon substantial completion of work, the Contractor shall request a walk- <br /> through by the Landscape Architect to formulate a "punch list " . Contractor <br /> shall complete " punch list " items as quickly as possible, and request another <br /> walk-through to verify completion. Upon successful completion of the " punch <br /> list " items, the work will be accepted by the Owner. <br /> C . The contractor is responsible for his own bathroom and drinking facilities . <br /> 6 . GUARANTEE <br /> ' A. Considering that the Owner will be responsible for maintaining all materials after <br /> acceptance, the Contractor shall guarantee to replace all plant materials for a <br /> period of time after final acceptance as follows : <br /> 2A - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.