Laserfiche WebLink
D . CODES AND STANDARDS : Work shall comply with the American Society for <br /> Testing and Materials (ASTM) and National Electrical Code. <br /> E . REQUIREMENTS OF REGULATORY AGENCIES : Work shall comply with <br /> codes, ordinances, and regulations of all governing authorities . <br /> F . WATER TESTING: Contractor shall test the salt content (chlorides and t . d . $) of <br /> the irrigation well . <br /> 4 . PRODUCT HANDLING: The Contractor shall protect all materials and work against <br /> injury from any cause and shall provide and maintain all necessary safeguards for the <br /> protection of the public . He shall be liable for any damage or injury to person or <br /> property which may occur as a result of his negligence in the prosecution of the work. <br /> 5 . JOB CONDITIONS <br /> A. EXISTING CONDITIONS <br /> 1 . Inspection : Contractor must examine the areas and conditions under which <br /> landscape irrigation system is to be installed and notify the Landscape <br /> Architect in writing of conditions detrimental to the proper and timely <br /> completion of the work. Do not proceed with the work until unsatisfactory <br /> conditions have been corrected . Contractor shall fully acquaint himself with <br /> related planting, electrical, paving, site and utilities work to preclude any <br /> misunderstanding and to facilitate a trouble-free installation at the site . <br /> 2 . Should any objectionable materials such as old concrete, bricks or other debris <br /> be encountered during the installation operation, they shall be removed from <br /> the site by the Contractor. <br /> B . SCHEDULING <br /> 1 . Crossings under paved areas as indicated, shall be installed by the Contractor. <br /> Crossings shall be installed prior to compaction of subgrade. <br /> 2 . Irrigation installation shall not begin until rough grades have been established . <br /> 3 . Contractor shall be responsible for coordinating his work with all other parties <br /> involved with the job, and shall coordinate the supply of electrical power to the <br /> timing device (controller) . <br /> 4 . Upon substantial completion of work, the Contractor shall request a walk- <br /> through by the Landscape Architect to formulate a " punch list " . Contractor <br /> shall complete "punch list " items as quickly as possible, and request another <br /> walk-through to verify completion . Upon successful completion of the " punch <br /> list " items, the work will be accepted by the Owner. <br /> C . The contractor is responsible for his own bathroom and drinking facilities . <br /> 2B - 2 <br />