My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . CODES AND STANDARDS : Work shall comply with the American Society for <br /> Testing and Materials (ASTM) and National Electrical Code. <br /> E . REQUIREMENTS OF REGULATORY AGENCIES : Work shall comply with <br /> codes, ordinances, and regulations of all governing authorities . <br /> F . WATER TESTING: Contractor shall test the salt content (chlorides and t . d . $) of <br /> the irrigation well . <br /> 4 . PRODUCT HANDLING: The Contractor shall protect all materials and work against <br /> injury from any cause and shall provide and maintain all necessary safeguards for the <br /> protection of the public . He shall be liable for any damage or injury to person or <br /> property which may occur as a result of his negligence in the prosecution of the work. <br /> 5 . JOB CONDITIONS <br /> A. EXISTING CONDITIONS <br /> 1 . Inspection : Contractor must examine the areas and conditions under which <br /> landscape irrigation system is to be installed and notify the Landscape <br /> Architect in writing of conditions detrimental to the proper and timely <br /> completion of the work. Do not proceed with the work until unsatisfactory <br /> conditions have been corrected . Contractor shall fully acquaint himself with <br /> related planting, electrical, paving, site and utilities work to preclude any <br /> misunderstanding and to facilitate a trouble-free installation at the site . <br /> 2 . Should any objectionable materials such as old concrete, bricks or other debris <br /> be encountered during the installation operation, they shall be removed from <br /> the site by the Contractor. <br /> B . SCHEDULING <br /> 1 . Crossings under paved areas as indicated, shall be installed by the Contractor. <br /> Crossings shall be installed prior to compaction of subgrade. <br /> 2 . Irrigation installation shall not begin until rough grades have been established . <br /> 3 . Contractor shall be responsible for coordinating his work with all other parties <br /> involved with the job, and shall coordinate the supply of electrical power to the <br /> timing device (controller) . <br /> 4 . Upon substantial completion of work, the Contractor shall request a walk- <br /> through by the Landscape Architect to formulate a " punch list " . Contractor <br /> shall complete "punch list " items as quickly as possible, and request another <br /> walk-through to verify completion . Upon successful completion of the " punch <br /> list " items, the work will be accepted by the Owner. <br /> C . The contractor is responsible for his own bathroom and drinking facilities . <br /> 2B - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.