My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
socket fittings with ASTM-A2564 solvent cement . <br /> 4 . SPRINKLER HEADS : Sprinkler heads shall be of the type shown on the drawings . <br /> Filter screens shall be included with all spray heads . <br /> 5 . RISERS AND SWING JOINTS : <br /> A. Risers and swing joints shall be as detailed on the drawings . <br /> B . Risers for shrub heads shall be Schedule 40 PVC pipe. <br /> C . PVC Flex connections : Shall be Ag-Products heavy walled flexible PVC pipe or <br /> equal . Average length of each connection is referred to on the drawings . Special <br /> flex cement shall be utilized for making these connections. <br /> 6. REMOTE CONTROL VALVES : Valves shall be as specified on the drawings . Use <br /> Teflon tape only on threaded connections . <br /> 7 . VALVE BOXES : Valve boxes shall be Ametek VP- 10 or approved equal . Install <br /> flush with finish grade as indicated on drawing. <br /> 8 . CONTROL WIRING: All wiring to automatic circuit valves shall be OF- 14 direct <br /> burial wire of a different color than the black and white wires used on the 115 volt <br /> A. C . power. Wiring from the controller to the valves shall be installed in same trench <br /> as the mainline where possible . All splices shall be made with Rain Bird snap-tite <br /> connectors, or approved equal . All wire shall be furnished in minimum 2, 500' reels <br /> and spliced only at valve or tee locations . <br /> 9 . CONTROLLER: Controller shall be as specified on the drawings. <br /> 10 . PUMP : Shall be a centrifugal, high head type as specified on the drawings. <br /> 11 . STRAINER: Shall be by Vu Flo, or approved equal . <br /> PART 3 - EXECUTION <br /> 1 . GENERAL: The Contractor shall be responsible for full and complete coverage of all <br /> irrigated areas and shall make any necessary adjustments at no additional cost to the <br /> Owner. <br /> 2 . INSTALLATION <br /> A. EXCAVATING AND TRENCHING: <br /> 1 . Perform all excavations as required for the installation of the work included <br /> under this section, including shoring of earth banks to prevent cave-ins. <br /> Restore all surfaces, existing underground installations, etc . , damaged or cut as <br /> a result of the excavations to their original conditions . <br /> 2B - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.