My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> the main and lateral pipes, if possible. Ten-inch loops shall be provided at each <br /> valve where control wires are connected . All wires passing under existing or <br /> future paving, construction, etc . , shall be encased in plastic pipe as specified, <br /> extending at least twelve inches beyond edges of paving or construction. <br /> E. TESTING: All main lines shall be hydrostatically tested in the presence of the <br /> Owner's representative at a pressure of 40 psi for a period of time not less than <br /> four (4) hours, should any leaks be found, they shall be repaired . The line shall <br /> then be retested until satisfactory. All lateral lines downstream from the remote <br /> control valves shall be visually inspected for leaks, should any be found, they shall <br /> be repaired . The line shall then be retested until satisfactory. <br /> F. BACKFILL AND COMPACTING After system is approved or sections thereof, <br /> backfill excavations and trenches with clean soil, free of rubbish. Backfill for all <br /> trenches, regardless of the type of pipe covered shall be compacted to a minimum <br /> 90% of its maximum density (AASHTO T480) . Dress off all areas to finish <br /> grades. <br /> G. PUMP ENCLOSURE : <br /> I . Pump house shall be pre-manufactured fiberglass enclosure bolted onto 6 " <br /> thick 3000 P . S . I . concrete slab . . 1 . <br /> 2 . Provide adequate interior space for maintenance. Approx. size: 4' x 4' x T tall . <br /> Increase size if necessary to accommodate equipment . <br /> 3 . Submit shop drawings for review prior to constructing. <br /> H . FINAL ADJUSTMENT Balance and adjust the irrigation system components for <br /> efficient, proper operation. This includes controller synchronization as well as <br /> individual settings of control stations. <br /> 3 . INSTRUCTIONS <br /> A. LABELS <br /> 1 . Number each zone valve box on underside of valve box cover with a black <br /> waterproof marker for reference. Numbers shall match the zone numbers on <br /> the drawings . <br /> 2 . Number each zone valve control wire at the controller with a waterproof <br /> marker and tags . Numbers shall match the zone numbers on the drawings . <br /> B . MAINTENANCE <br /> 1 . Maintain the irrigation system until final acceptance of the work. Maintenance <br /> shall include work, materials and replacements necessary to insure a complete <br /> properly operating system. <br /> 2 . It will be the Owner's responsibility to maintain the system in working order <br /> 2B - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.