My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 3 . 03 INSTALLATION <br /> A . Timber sheeting shall be installed in accordance with OSHA requirements . The timber <br /> sheeting shall be driven to the depth of the trench bottom . Cross braces shall be placed in <br /> the true horizontal position, spaced vertically and secured to prevent sliding, falling , or <br /> kickouts . <br /> B . Steel sheet piling of equal or greater strength may be substituted for timber trench <br /> shoring . The Contractor shall provide certification that the steel sheet piling substituted <br /> provides equal or greater protection than the timber shoring. The certification for the <br /> sheet piling shall be provided by a Registered Professional Engineer. The steel sheet <br /> piling shall be driven to the minimum depth below the trench bottom as recommended by <br /> the Registered Professional Engineer providing the design . Place cross braces in true <br /> horizontal position, spaced vertically and secure to prevent sliding, falling or kickouts . <br /> C . Portable trench boxes may be substituted for the timber trench shoring. The trench box <br /> shall be designed to provide equal or greater protection than the timber trench shoring . <br /> Certification of the design shall be provided by the Contractor prior to its use on the <br /> project . In cases where the top of the portable trench box will be below the top of the <br /> trench, the trench must be sloped to the approximate angle of repose for the soil <br /> conditions existing on the project. In areas where the sloped trench will affect the <br /> integrity of existing structures, the Contractor shall take measures necessary to protect the <br /> structures prior to sloping the trench . <br /> D . When trench jacks are used for cross bracing and or stringers, the Contractor shall <br /> provide certification by the Manufacturer, that the trench jacks provide protection greater = <br /> than or equal to timber cross bracing. <br /> E . In trenches four (4) feet deep or greater, the Contractor shall provide adequate means of <br /> trench egress using ladders or steps . Ladders must extend three (3 ) feet above the <br /> existing ground level . Ladders shall be positioned in accordance with the following : <br /> Trench Length Position of Ladder <br /> Less than 10 feet At center <br /> Less than 25 feet At third points <br /> Less than 50 feet At each end and center <br /> Greater than 50 feet Not more than 25 feet <br /> 3 . 04 SUPERVISION <br /> A . The Contractor shall provide competent supervisory personnel at each trench while work <br /> is in progress , to ensure that the Contractor' s methods , procedures, equipment and <br /> materials pertaining to the safety systems , are sufficient to meet the requirements of <br /> OSHA Standards and Regulations . <br /> 02015 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.