Laserfiche WebLink
SECTION 02201 <br /> CLEARING AND GRUBBING <br /> 1 . SCOPE <br /> A . The Contractor shall furnish all labor, materials and equipment, and all <br /> operations required to ' clear and grub the site as shown on the Plans and <br /> specified herein. <br /> 2. GENERAL <br /> A. Clearing and grubbing shall consist of the complete removal and disposal of all <br /> trees, brush, logs , stumps, roots, weeds , rubbish, rocks, structures designated to be <br /> removed, concrete and other deleterious material and obstructions resting upon or <br /> protruding through the surface of the ground . Stumps , roots 3 " and over and similar <br /> obstructions shall be removed to a minimum depth of 2 feet below the existing <br /> ground. All structural items shall be excavated to full depth, completely removed, <br /> and the excavation backfilled per these specifications . <br /> Be The Contractor shall clear and grub the areas described below: <br /> 1 ) Within the areas of development. <br /> 3 . DISPOSAL <br /> A . BURNING PERMITTED ON SITE <br /> 1 . When permitted by local governing authorities , trees, stumps , brush, <br /> weeds and similar natural materials may be burned on site . The <br /> Contractor shall dispose of all unburned residue off site, and if required by <br /> the Engineer, spread the ash. Material which will not burn or will not burn <br /> without air pollution such as asphalt and tires shall be hauled off site for <br /> disposal in an approved manner. <br /> B . OFF SITE DISPOSAL <br /> 1 . When on site burning is not permitted, all material shall be hauled off <br /> site by the Contractor for disposal in an approved manner. <br /> C . The Contractor shall be responsible for obtaining and complying with the <br /> provisions of all necessary permits . All fees shall be paid by the Contractor. <br /> D . No material shall be buried on site . <br /> C : \ Down1oad \ techspec - 02201 . doc 02201 - 1 <br />