My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iSECTION 02202 <br /> EXCAVATION <br /> L SCOPE <br /> A. The Contractor shall furnish all necessary labor, equipment, and <br /> transportation to excavate and haul material in accordance with the Plans and <br /> Specifications . <br /> 2 . GENERAL <br /> ' A . The Contractor shall excavate for the roadways , structures, swales , etc . , as <br /> shown on the Drawings and specified herein, and shall dispose of all materials <br /> excavated at a site designated or approved by the Owner. <br /> 3 . DISPOSAL <br /> A . In all areas where excavation is to be done, all earth, rock, muck and other <br /> materials shall be removed and separated as to suitable and unsuitable <br /> material for backfill as defined herein. <br /> B . The Contractor may, for his own convenience, elect to temporarily stockpile any <br /> portion of the excavated material at a job site location designated by the Owner, for <br /> later use or disposal . The stockpiled material shall be piled in an orderly manner <br /> so as not to endanger the work or obstruct roadways or drainage within the <br /> designated job site location . All excavated unsuitable material shall be disposed <br /> of at a location designated or approved by the Owner. All excavated suitable <br /> material that is not reused by the Contractor within the job site shall become <br /> the property of the Owner and shall be disposed of as directed by the Owner. <br /> 4 . SHEE'T'ING AND BRACING <br /> A . Where excavations may endanger workmen <br /> y , existing structures, utilities or other <br /> facilities , it shall be the Contractor's responsibility to immediately install and <br /> maintain adequate sheeting and bracing per OSHA specifications in order to <br /> protect said facility . No work shall proceed in such excavations until the sheeting <br /> and bracing has been properly and completely installed . The sheeting thus <br /> installed shall be removed as the work progresses or, at the discretion of the <br /> Engineer, be cut off below finished grade and left in place . Sheeting and bracing <br /> may be either steel or wood at the option of the Contractor. <br /> B . Sheeting and bracing shall be installed in a manner that will allow for removal <br /> without injuring or endangering workmen, the work, adjacent structures, and the <br /> like . Voids caused by withdrawal of sheeting shall be promptly and <br /> completely filled with sand and compacted to a degree equal to the <br /> surrounding soil . <br /> C : \ Down1oad \ techspec - 02202 . doc 02202 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.