My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 02204 <br /> ' GRASSING BY SODDING <br /> 1 . SCOPE <br /> A . The Contractor shall furnish all materials , labor, equipment and supervision <br /> ' required to prepare the soil , fine grade the area and establish a healthy stand of <br /> grass by sodding of the areas so designated on the drawings and as specified herein. <br /> ' 2 . GENERAL <br /> A . PREPARATION <br /> 1 . The area to be sodded shall be clear of old sod and weeds . The area shall <br /> be fine graded and the surface loosened, by scarifying, if necessary . <br /> If the soil is dry it shall be moistened to provide an optimum growing <br /> condition . <br /> B . FERTILIZER <br /> 1 . Fertilizer shall be uniformly spread over the area to be sodded at the rate of <br /> ' 400 to 500 pounds per acre . The fertilizer shall have a chemical designation <br /> of 124 - 8 . Soil which has a PH of 5 . 0 or lower shall , if directed by the <br /> Engineer, have an application of dolomite lime stone, but the amount of <br /> dolomite applied shall not raise the PH above 6 . 0 . <br /> C . SOD <br /> ' 1 . The sod shall be either St. Augustine or Bahia as specified on the plans or <br /> directed by the Engineer. The sod shall be of a tough texture with a good <br /> mat of roots . It shall be free of weeds and other objectionable grasses . <br /> Approximately three days prior to cutting the sod, it shall be closely <br /> mowed and raked to remove excess growth and debris . The sod shall be <br /> cut with sufficient thickness to retain the root system intact . There shall be <br /> a minimum of delay between the cutting of the sod and the laying so that <br /> it is live, fresh and uninjured when laid . <br /> i <br /> 1 <br /> ' C : \ Down1oad \ techspec - 02204 . doc 02204 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.