Laserfiche WebLink
' SECTION <br /> 02206 <br /> ' SITE CLEANUP & RESTORATION <br /> ' i . SCOPE <br /> ' A . The Contractor shall furnish all plant, labor, equipment, appliances and <br /> materials required or necessary to clean up the site after the construction is <br /> ' completed and to restore items disturbed or damaged due to his construction <br /> operation. <br /> 2 . GENERAL <br /> A . During the progress of the project, the work and the adjacent areas affected <br /> thereby shall be kept in a neat and orderly condition. All rubbish, surplus <br /> materials, and unused construction equipment shall be removed . All damage <br /> shall be repaired so that the public and private property owners will be <br /> inconvenienced as little as possible . <br /> B . Where material or debris has been deposited in watercourses , ditches , gutters , <br /> ' drains , or catch-basins as a result of the Contractor' s operations, such <br /> material or debris shall be entirely removed and satisfactorily disposed of <br /> during the progress of the work, and the ditches , channels , drains , etc . , shall be <br /> ' kept clean. <br /> C . Before the completion of the project, the Contractor shall , unless otherwise <br /> especially directed or permitted in writing, tear down and remove all <br /> temporary buildings and structures which he builds ; remove all temporary <br /> works, tools, and machinery or other construction equipment furnished by <br /> ' him ; remove, acceptably disinfect, and cover all organic matter and material <br /> containing organic matter in, under, and around privies , houses , and other <br /> buildings used by him ; remove all rubbish from any grounds which he has <br /> occupied; and leave the roads , all parts of the premises and adjacent property <br /> affected by his operations, in a neat and satisfactory condition. <br /> ' D . It shall be the responsibility of the Contractor to repair, rebuild, or restore to its <br /> former conditions , any and all portions of existing utilities , structures , <br /> equipment, appurtenances, trees and shrubs, or facilities , other than those to be <br /> ' paid for under the specifications, which may be disturbed or damaged due to his <br /> construction operations . <br /> ' E . The Contractor shall thoroughly clean all materials and equipment installed by <br /> him and his subcontractors and on completion of the work shall deliver the <br /> facilities undamaged and in fresh and new-appearing condition . <br /> C : \ Down1oad \ techspec - 02206 . doc 02206 - 1 <br />