My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION <br /> 02206 <br /> ' SITE CLEANUP & RESTORATION <br /> ' i . SCOPE <br /> ' A . The Contractor shall furnish all plant, labor, equipment, appliances and <br /> materials required or necessary to clean up the site after the construction is <br /> ' completed and to restore items disturbed or damaged due to his construction <br /> operation. <br /> 2 . GENERAL <br /> A . During the progress of the project, the work and the adjacent areas affected <br /> thereby shall be kept in a neat and orderly condition. All rubbish, surplus <br /> materials, and unused construction equipment shall be removed . All damage <br /> shall be repaired so that the public and private property owners will be <br /> inconvenienced as little as possible . <br /> B . Where material or debris has been deposited in watercourses , ditches , gutters , <br /> ' drains , or catch-basins as a result of the Contractor' s operations, such <br /> material or debris shall be entirely removed and satisfactorily disposed of <br /> during the progress of the work, and the ditches , channels , drains , etc . , shall be <br /> ' kept clean. <br /> C . Before the completion of the project, the Contractor shall , unless otherwise <br /> especially directed or permitted in writing, tear down and remove all <br /> temporary buildings and structures which he builds ; remove all temporary <br /> works, tools, and machinery or other construction equipment furnished by <br /> ' him ; remove, acceptably disinfect, and cover all organic matter and material <br /> containing organic matter in, under, and around privies , houses , and other <br /> buildings used by him ; remove all rubbish from any grounds which he has <br /> occupied; and leave the roads , all parts of the premises and adjacent property <br /> affected by his operations, in a neat and satisfactory condition. <br /> ' D . It shall be the responsibility of the Contractor to repair, rebuild, or restore to its <br /> former conditions , any and all portions of existing utilities , structures , <br /> equipment, appurtenances, trees and shrubs, or facilities , other than those to be <br /> ' paid for under the specifications, which may be disturbed or damaged due to his <br /> construction operations . <br /> ' E . The Contractor shall thoroughly clean all materials and equipment installed by <br /> him and his subcontractors and on completion of the work shall deliver the <br /> facilities undamaged and in fresh and new-appearing condition . <br /> C : \ Down1oad \ techspec - 02206 . doc 02206 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.