My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Application of Fertilizer -If there is reason to believe that the soil PH is <br /> lower than 5 . 5 , the Contractor shall have the soil tested. If it is below 5 . 0, <br /> the Contractor shall apply sufficient dolomite limestone to bring the PH <br /> to between 5 . 0 and 6 . 0 . The fertilizer to be used shall have a chemical <br /> designation of 12-8 - 8 . At least 50 percent of the phosphoric acid shall be <br /> from normal supper phosphate having a minimum of two units of sulphur. <br /> The fertilizer and/or limestone shall be spread uniformly over the area to be <br /> grassed at the rate of 1 , 000 pounds per acre . Immediately after the fertilizer <br /> is spread, it shall be mixed with the soil to a depth of approximately four <br /> inches . <br /> 3 . Seeding - While the soil is still loose and moist, the seed shall be <br /> scattered uniformly over the area. Unless otherwise directed, the grass <br /> seed shall be 20 part Bermuda and 80 parts Argentine Bahia. The Bahia <br /> seed shall be scarified seed having a total germination of 85 % . 10 to 20 <br /> parts of a Quick- growing noncompetitive grass seed such a millet or <br /> Italian rve shall be included to provide early ground cover. The rate of <br /> spread for the permanent-type seed mixture shall be 100 pounds per acre <br /> The rate of spread for the quick growing seed shall be 20 pounds per acre <br /> 4 . Mulching - Approximately two inches , loose thickness, of the mulch <br /> material shall be applied uniformly over the seeded . area, and the mulch <br /> material cut into the soil with the equipment specified so as to produce a <br /> loose mulched thickness of three to four inches . Care shall be exercised that <br /> the materials are not cut too deeply into the soil . <br /> 5 . Rolling - Immediately after completion of the seeding and mulching, the <br /> entire area shall be rolled thoroughly with the equipment specified. At least <br /> two trips over the entire area will be required. <br /> 6 . Watering - The seeded areas shall be watered so as to provide <br /> optimum growth conditions for the establishment of the grass . In no case, <br /> however, shall the period of maintaining such moisture be less than two <br /> weeks after the planting. <br /> D . MAINTENANCE <br /> 1 . The Contractor shall maintain the grassed areas in a satisfactory <br /> manner until 90 days after final acceptance of the Contract and until the <br /> seed has germinated and a stand of grass established . Maintenance <br /> shall include repairing any damaged or eroded areas and reseeding any <br /> areas which do not produce a satisfactory stand of grass . <br /> E:\PSW\P\99-91 a\TechsSpecs\techspec-02205 .doc 02205-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.