Laserfiche WebLink
SECTION 02208 - GRASSING BY SPRIGGING <br /> ' PART 1 - GENERAL <br /> ' 1 . 01 DESCRIPTION <br /> The Contractor shall furnish all labor, equipment, and materials necessary for grassing all <br /> areas indicated on plans . The Engineer shall designate those areas to receive sprigs and those <br /> to receive sod. The Engineer shall also designate the type of sprig/sod to be used in each <br /> ' area. <br /> 1 . 02 STORAGE OF MATERIALS <br /> The Contractor shall provide space for storage of sprigsrior to placement in a manner that <br /> P <br /> will not endanger or restrict pedestrian or vehicular traffic or interfere with other aspects of <br /> the work. <br /> PART 2 - PRODUCTS <br /> 2 . 01 SPRIGS <br /> The playing fields shall be sprigged with hybrid 419 Bermuda Grass Sprigs . <br /> 2 . 02 SOD <br /> Sod Grass shall be as per plans and in accordance with Section 02204Grassing by Sodding . <br /> A. Delivery and Storage : <br /> Each of the species or varieties of sprigs and sod shall be furnished and delivered on <br /> field pallets . During handling and storing, the sprig grass shall be cared for in such <br /> a manner that it will be protected from damage by heat, moisture, rodents , and other <br /> causes . <br /> ' 2 . 04 GRASSING EQUIPMENT <br /> A. Rollers : <br /> A cultipacker, traffic roller, or other suitable equipment will be required for rolling <br /> the sprigged area. <br /> ' PART 3 - EXECUTION <br /> ' 3 . 01 GENERAL CONSTRUCTION METHODS <br /> Spricr operations will not be permitted until the soil is moist and in proper condition to <br /> induce growth. No sprigging shall be done when the ground is below 40 degrees F . , unduly <br /> wet, or otherwise not in a suitable condition. Whenever a suitable length of right-of--way or <br /> 02208-1 <br />