My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02208 - GRASSING BY SPRIGGING <br /> ' PART 1 - GENERAL <br /> ' 1 . 01 DESCRIPTION <br /> The Contractor shall furnish all labor, equipment, and materials necessary for grassing all <br /> areas indicated on plans . The Engineer shall designate those areas to receive sprigs and those <br /> to receive sod. The Engineer shall also designate the type of sprig/sod to be used in each <br /> ' area. <br /> 1 . 02 STORAGE OF MATERIALS <br /> The Contractor shall provide space for storage of sprigsrior to placement in a manner that <br /> P <br /> will not endanger or restrict pedestrian or vehicular traffic or interfere with other aspects of <br /> the work. <br /> PART 2 - PRODUCTS <br /> 2 . 01 SPRIGS <br /> The playing fields shall be sprigged with hybrid 419 Bermuda Grass Sprigs . <br /> 2 . 02 SOD <br /> Sod Grass shall be as per plans and in accordance with Section 02204Grassing by Sodding . <br /> A. Delivery and Storage : <br /> Each of the species or varieties of sprigs and sod shall be furnished and delivered on <br /> field pallets . During handling and storing, the sprig grass shall be cared for in such <br /> a manner that it will be protected from damage by heat, moisture, rodents , and other <br /> causes . <br /> ' 2 . 04 GRASSING EQUIPMENT <br /> A. Rollers : <br /> A cultipacker, traffic roller, or other suitable equipment will be required for rolling <br /> the sprigged area. <br /> ' PART 3 - EXECUTION <br /> ' 3 . 01 GENERAL CONSTRUCTION METHODS <br /> Spricr operations will not be permitted until the soil is moist and in proper condition to <br /> induce growth. No sprigging shall be done when the ground is below 40 degrees F . , unduly <br /> wet, or otherwise not in a suitable condition. Whenever a suitable length of right-of--way or <br /> 02208-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.