My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 02301 <br /> SUBGRADE <br /> 1 . DESCRIPTION <br /> A. The subgrade will be constructed such that after being compacted it will <br /> ' conform to the line, grade, and cross sections as shown on the Drawings . <br /> Shoulders shall be stabilized and compacted as specified herein for subgrades . <br /> 2 . LIMEROCK BEARING RATIO <br /> A. The subgrade shall have a minimum bearing ratio of 40 as determined by the <br /> Limerock Bearing Ratio Test. In an area where the bearing ratio is less than 40, <br /> stabilizing material approved by the Engineer shall be furnished by the <br /> Contractor, spread and mixed in accordance with Section 160-5 . 3 " Mixing " of <br /> the 1991 Edition of the Florida D . O . T. Standard Specifications for Road and <br /> Bridge Construction (FDOT Specs) . <br /> 3 . CONSTRUCTION DETAILS <br /> A. The subgrade shall be shaped, graded, and rolled to conform to the lines and <br /> grades as shown on the Drawings . Fine grading of the subgrade to its final <br /> profile shall be accomplished after the existing ground has been excavated as <br /> close as possible to the design elevations . In fill areas , fine grading of the <br /> ' subgrade shall be accomplished after fill is spread and compacted in accordance <br /> with Section 02203 of these Specifications . <br /> ' B . All drainage culverts and utility conduits which will be installed under the <br /> pavement shall be installed prior to the final shaping and compaction of the <br /> subgrade . As-built elevations shall be confirmed to meet design drawings prior to <br /> ' placement of base material . <br /> 4. COMPACTION <br /> A . The top of the subgrade in both cuts and fills shall be compacted to a <br /> minimum of 98 percent of the maximum dry density to the depth specified on the <br /> ' Plans . The required density shall be maintained until the base course has been <br /> constructed . The subgrade shall be compacted with an approved self-propelled <br /> steel drum or pneumatic tired roller weighing not less than 8 tons . All hollows <br /> ' and depressions which develop under rolling shall be filled in with suitable <br /> material . The process of grading and rolling shall be repeated until no depressions <br /> develop . After compaction, the top surface of the fine grade shall be true to line <br /> ' and grade at all locations . If the fine grade becomes rutted or displaced due to <br /> any cause whatsoever, the Contractor shall regrade it and recompact it. <br /> Ditches , drains, and swales shall be maintained along the completed <br /> ' subgrade section after their construction. <br /> C : \ D0wn1oad \ techspec - 02301 . doc 02301 - 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.