time, the Contractor shall remove the mixture, reshape and recompact the <br /> subgrade, replace the materials removed with additional coquina shell and reshape <br /> and recompact the coquina shell base at no cost to the Owner. <br /> D . If cracks or checks appear in the base which would impair the structural <br /> integrity of the base in the opinion of the Engineer, the Contractor shall <br /> remove the cracks or checks b i <br /> y rescarEying, reshaping, refilling with coquina shell <br /> where necessary, and recompacting at no cost to the Owner. <br /> E . The finished coquina shell base shall be checked for thickness at intervals of not <br /> more than 500 feet. Any areas which are less than 7- 1 /2 inches in thickness shall be <br /> corrected by scarifying and adding rock. The scarifying shall extend for 50 feet <br /> either side of the deficient area. Areas which are less than 1 /2 inch deficient in <br /> thickness shall be corrected if the Engineer determines that the area is extensive or <br /> may adversely affect the quality of the finished work . <br /> 6. PRIME COAT <br /> A. The prime coat shall be a rapid curing liquid cut back asphalt equal or <br /> equivalent to RC-70 or RC -250 at the Contractor's option, and conforming to <br /> Sections 300 and 916-2 of the 1991 Edition of the Florida D . O . T. Standard <br /> Specifications for Road and Bridge Construction, <br /> B . The surface of the base material shall be cleaned after final compaction and the <br /> moisture content of the base shall not exceed 90 percent of the optimum moisture <br /> before the prime coat is applied. The prime coat shall be applied uniformly with a <br /> pressure distributor. The entire length of the spray bar shall be set at the height <br /> above the surface recommended by the Manufacturer for even distribution. The <br /> prime coat shall be applied to the finished base course at the rate of 0 . 15 gallons per <br /> square yard at a temperature between 100° F. t° 1110 F . The prime coat shall be <br /> applied such that a period of no longer than two (2) hours lapse prior to <br /> application of the asphaltic concrete wearing course, unless the prime coat is covered <br /> with sand or screenings as outlined in Section 300-6 . 5 of the 1991 Edition of the <br /> Florida D . O . T. Specifications. <br /> 7. TESTING <br /> A . The maximum density and optimum moisture shall be determined in <br /> accordance with the Modified Proctor Test procedures of ASTM-D1557 or <br /> AASHTO-T180 (Method D) . The percentage compaction and in-place <br /> density shall be determined according to procedures of ASTM-D „ <br /> 2167 Test for <br /> Density of Soil In-Place by the Rubber Balloon Method " or the nuclear method <br /> ASTM- D2922 . In general , one Modified Proctor Test per 500 lineal feet of <br /> roadwork shall be performed on a representative sample of base material from <br /> location(s) designated by the Engineer. In-place density testing shall be <br /> performed at the rate of one test per 500 lineal feet of roadwork at comparable <br /> locations unless otherwise specified by the Engineer. <br /> C :\DON7lload\techspec-02304 .doc 02304-2 <br />