My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 02304 <br /> ' CEMENTED COQUINA SHELL BASE COURSE <br /> 1 . DESCRIPTION <br /> ' A. Under this item, the Contractor shall furnish all equipment, labor, materials, and <br /> transportation necessary to construct a Coquina shell base course upon the <br /> completed stabilized subgrade . The base course shall be constructed in <br /> accordance with the lines , grades , and typical section as shown on the Drawings . <br /> Unless otherwise noted construction shall conform to the provisions of Florida <br /> ' D . O . T. Standard Specifications for Road and Bridge Construction, Section 250, <br /> 1991 Edition. <br /> 2 . MATERIALS <br /> A . Coquina shell shall conform to the requirements of Florida D . O . T. Standard <br /> Specifications, 1991 Edition, Section 915 , and shall be from a source acceptable to <br /> Florida D . O . T. The material shall have a minimum LBR value of 100 . Prior to <br /> placement, the material shall be crushed or broken to such a size that no less than <br /> 97 percent by weight will pass a 3 1 /2 inch sieve and no more than 20 percent dry <br /> weight shall wash through a No . 200 sieve . No visible clay or organic matter will be <br /> permitted . <br /> 3 . PLACEMENT OF MATERIAL <br /> ' A . After the subgrade is completed and approved, the Contractor shall furnish and <br /> spread the coquina shell in a uniform distribution. Spread thickness shall be a <br /> minimum of 8 inches . Segregated areas of fine or course rock will not be permitted . <br /> ' Such areas shall be removed and replaced with properly graded rock. <br /> B . After the spreading is completed, the entire surface shall be scarified and <br /> ' shaped so as to produce the required grade and cross section after <br /> compaction. <br /> ' 4 . COMPACTION <br /> A . The required compaction of the coquina shell base course shall be a minimum of 98 <br /> percent of the maximum dry density . <br /> B . No less than 8 - 10 ton steel drum or pneumatic tired roller shall be used to <br /> ' compact the base course . All depressions shall be filled and the process of <br /> rolling and filling shall continue until a thoroughly compacted uniform <br /> ' surface is produced. During final compaction operations , if blading of any area <br /> is necessary to obtain the true grade and cross section, the compaction operations <br /> for such areas shall be completed prior to making the field density-compaction test <br /> on the finished base . <br /> C . Should the subgrade material become mixed with the base course material at any <br /> t CADown1oad\techspec-02304 .doc 02304- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.