My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
constant and wide fluctuations of temperature during the day will not be <br /> permitted . Asphaltic concrete whose temperature is less than 210oF when <br /> delivered to the job site may result in immediate rejection from application by <br /> the Engineer. All material rejected by the Engineer shall be replaced with <br /> specified material by the Contractor at no additional cost to the Owner. <br /> B . The asphaltic concrete shall be applied by an approved type of self propelled <br /> paver, such as a Barber Green, capable of making a continuous 10 ft. wide <br /> pull . The paver shall have a disbursing hopper, a compacting devise, and a <br /> screed capable of adjustment to produce the required paving cross section. <br /> The screed shall be equipped with heaters . <br /> Co Immediately after the asphaltic concrete is spread, any deviations from the <br /> typical section shall be remedied by placing additional material or by <br /> removing surplus material while the mixture is still hot. <br /> D . Rolling should begin as soon as possible after the asphaltic concrete has been <br /> spread as specified. Rolling of the longitudinal joint should be immediately <br /> behind the paving operation. The initial pass with the roller should be made as <br /> soon as it is possible to roll the bituminous mixture without cracking the mat <br /> or having the mix adhere to the roller wheels . <br /> E. The rolling shall be done by a " Rolling Train" , consisting of a steel wheel seal <br /> roller, and a pneumatic tired traffic roller and a steel wheel finish roller. All of <br /> which shall be on the job when the asphalt laying commences and remain on the <br /> project until the paving work has been completed. <br /> F . Rolling of the longitudinal joint should be immediately behind the paving <br /> operation . The initial pass with the roller should be made as soon as it is <br /> possible to roll the bituminous mixture without cracking the mat or having the <br /> mix adhere to the roller wheels . To prevent adhesion of the mix to the roller, the <br /> wheels should be kept moist with only enough water to avoid picking up the <br /> material . <br /> G. Steel wheeled rollers shall be of the tandem type . For seal rolling, these <br /> rollers shall weigh between 5 and 12 tons and for final rolling, they shall weigh <br /> between 8 and 12 tons . <br /> H. Traffic rollers shall be of the self propelled pneumatic tired type, equipped <br /> with at least seven (7) smooth tread, low pressure tires , with the tire pressure <br /> maintained between 50 to 55 pounds . Traffic rollers shall weigh between 6 <br /> and 10 tons . Wobble wheeled rollers are prohibited from rolling on this <br /> project. <br /> I . The speed should not exceed 3 mph for steel wheeled rollers or 5 mph for <br /> pneumatic tired rollers . <br /> J . Finish rolling should be done while the material is still workable enough for <br /> removal of roller marks , before the pavement temperature has dropped <br /> C : \ Down1oad \ techspec - 02305 . doc 02305 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.