My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 . CURING <br /> A . General : The concrete shall be continuously cured fora eriod of at least 7 <br /> days . Curing shall be commenced after f nishina has been completed and as <br /> soon as the concrete has hardened sufficiently to permit application of the <br /> curet material without marring the surface . Any curing material removed or <br /> damaged during the 7 day veriod shall be replace immediately . <br /> After forms are removed, the surfaces exposed shall be cured by placing a <br /> berm of moist earth against them or by any of the methods described below, for <br /> the remainder of the 7 day curing period. <br /> c <br /> 1 . Wet Burlap Method : Burlap shall be placed over the entire exposed <br /> surface of the concrete with sufficient extension beyond each side to <br /> insure complete coverage. Adjacent strips shall be overlapped a <br /> minimum of six inches . The burlap shall be held securely in place such <br /> that it will be in continuous contact with the concrete at all times and no <br /> earth shall be permitted between the burlap surfaces at laps or <br /> between the burlap and the concrete. The burlap shall be kept <br /> thoroughly wet throughout the curing period. <br /> 2 . Membrane Curing Method : Clear membrane curing compound or <br /> white-pigmented curing compound shall be applied by hand sprayer in a <br /> single-coat continuous film at a uniform coverage of at least one <br /> gallon to each 200 square feet. Any cracks, checks or other defects <br /> appearing in the coating shall be recoated immediately. The curing <br /> compound shall be thoroughly agitated in the drum prior to <br /> application, and during application as necessary to prevent settlement of <br /> the pigment. <br /> 3 . Polyethylene Sheeting Method : Polyethylene sheeting shall be placed <br /> over the entire exposed surface of the concrete, with sufficient <br /> extension beyond each side to insure complete coverage . Adjacent <br /> strips shall be overlapped a minimum of six inches . The sheeting shall <br /> be held securely in place such that it will be in continuous contact with <br /> the concrete at all times . <br /> C : \ Down1oad \ techspec- 02307 . doc 02307 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.