Laserfiche WebLink
The survey work for the Class I waste area will include a complete topographic survey of the <br /> "Infill", the eastern top of Segment I, as well as the ditches and roadways surrounding the Class <br /> I area. The topographic survey of the C&D landfill site will include the waste area, as well as <br /> the fence-line and the surrounding ditches and berms adjacent to the C&D site and the C&D <br /> Expansion area . CDM will review the volumetric modeling and include a summary of <br /> estimated waste density based on the results of the survey and volumetric modeling. <br /> The deliverable from Carter Associates, Inc . will consist of a survey report identifying the dates <br /> the field survey was completed. Airspace consumed and remaining airspace based on <br /> construction and design criteria shall be specifically identified. The survey report shall also <br /> include the results of the volumetric calculations for the Segment II portions of the Class I <br /> landfill, as well as the C&D landfill area. Deliverables accompanying the report shall include : <br /> A 1 " = 50' scale contour map for each site with one-foot contour intervals in regular weight <br /> lines, and five foot contour intervals in bold weight lines. Each contour map shall also be <br /> provided on reproducible Mylar. Signed and sealed contour maps will be provided on 81/2 " by <br /> 14" paper of each landfill site in 1 " = 200' scale. Each 1 " = 200' scale map shall also be provided <br /> on a reproducible Mylar. A diskette or CD with ASCII file of the survey data in AutoCAD R14 <br /> will also be provided . <br /> For the Class I landfill, the report shall include an evaluation of the compaction of the waste and <br /> an analysis as to whether Waste Management is meeting its contractual compaction <br /> requirements. For the C&D site, an evaluation of footprint and side slopes shall be provided, <br /> with an analysis as to whether the site is being operated and constructed in accordance with the <br /> permitted design. <br /> SCHEDULE <br /> It is estimated that it will take approximately four months from the time that CDM receives <br /> notice to proceed to complete the work outlined in Tasks 1 .1 ad 1 . 2. The survey will be field <br /> documented by June 15, 2003 and the subsequent survey and survey report will be completed <br /> by July 15, 2003 . The completed Financial Assurance Report will be completed by September 1, <br /> 2003 . <br /> TASK 2. 0 - FULL COST ACCOUNTING STUDY AND REPORT FOR FISCAL YEAR 2001 -2002 <br /> Under provisions of Chapter 62-708 .300 (3), Florida Administrative Code, IRC SWDD is <br /> required to determine and publicly disclose the full cost of solid waste management within its <br /> service area for Fiscal Year 2001-2002. <br /> CDM will prepare a report setting forth the full cost of solid waste management for Fiscal Year <br /> 2001-2002 in accordance with the requirements of Chapter 62-708, Florida Administrative Code . <br /> CDM will also prepare a draft public notice based on the full cost of solid waste management in <br /> IRC for Fiscal Year 2001-2002 . <br /> CDM will provide a draft report and public disclosure notice to IRC by March 22, 2003 <br /> assuming receipt of all data required to perform the study by March 1 , 2003 . <br /> B-2 mh1163 <br />