Laserfiche WebLink
After receipt of comments, CDM will submit the final report and public disclosure notice within <br /> two weeks . IRC is required to advertise this public disclosure notice in a local newspaper by <br /> the end of March. <br /> TASK 3 . 0 - RECYCLING BALER IMPROVEMENTS <br /> SWDD operates a Baler as part its Solid Waste Management Recycling program. The Baler is <br /> used to prepare high quality bales of aluminum cans, steel cans, plastics and cardboard which <br /> are sold to recyclers . The existing baler and feed conveyor need significant repairs to continue <br /> to operate efficiently. CDM will assist SWDD in replacing the existing baler and the existing <br /> feed conveyor with new, more efficient equipment for the recycling operation. No changes are <br /> expected at this time for the existing Baler building, however on evaluation of the existing <br /> concrete foundation will be necessary. <br /> CDM will perform a conceptual layout of the new Baler in the existing building to verify that <br /> the configuration will work. CDM will visit one operating installation of a Baler of the type to <br /> be used for this project. An installation which processes material identical, or similar to that to <br /> be processed at IRC will be chosen for the visit. <br /> CDM will develop a specification for use by IRC SWDD in obtaining vendor quotes for this <br /> work. CDM will also assist in developing a list of suitable manufacturers for this equipment. <br /> SWDD will solicit the quotes and CDM has budgeted 8 hours for limited assistance in <br /> answering questions of the vendors . <br /> CDM will provide limited assistance during construction and startup . A review of a shop <br /> drawing submittal is included, and observation for 1 day during testing after startup . <br /> This work will require the assistance of John Dean in evaluating structural impacts and <br /> electrical needs of the new equipment. John Dean will evaluate the existing structural slab and <br /> the structural requirements of the new Baler . If modifications of the existing slab are required <br /> he will provide a design which strengthens the existing slab to accommodate the new Baler. <br /> In addition, John Dean will evaluate the existing electrical service for the existing Recycling <br /> Baler building. If additional power is needed for the replacement Baler infeed conveyor or for <br /> the new Recycling Baler a design will be provided for this additional electrical service . <br /> Also the installation of a small sump pump has been discussed with SWDD to improve <br /> drainage in the existing Baler building. This sump pump would be located in the bottom of the <br /> existing Baler infeed conveyor pit and would discharge water to the existing landfill sanitary <br /> sewer . The electrical design would include providing power to the new sump pump . <br /> TASK 4.0 - CLASS I OPERATIONS CONTRACT NEGOTIATIONS ASSISTANCE <br /> This task consists of consulting engineering services for assistance with negotiations with Waste <br /> Management Inc . of Florida (WMIF) for an extension to the existing Class I Operations Contract. <br /> After preliminary discussions with WMIF and a review of the current costs for disposal of Class <br /> I waste, it has been agreed that SWDD will attempt to negotiate an extension to the existing <br /> B_3 mh1163 <br />