Laserfiche WebLink
C . Non- Compliance : Should the Owner or Engineer determine that traffic within the project is <br /> not being maintained in accordance with the approved traffic control pian or presents a public <br /> safety concern , the contractor shall have until the end of the working day, in which <br /> notification is given, to take action to modify the maintenance of traffic . Should <br />the <br /> contractor fail to make such modification the Owner shall have the option to fine <br /> the <br /> Contractor $400 per day until remedied . <br /> SECTION 120 <br /> EMBANKMENT <br /> Price and payment will be full compensation for all earthwork including all material for constructing <br /> the embankment ; all clearing and grubbing ; removal of rubbish and vegetation ; all excavating; boxing <br /> out shoulder widening; placing and compacting material , compacting existing subgrade ; removal and <br /> disposal of excess material ; grading shoulders to match elevation of pavement edge and existing <br /> ground ; dressing of the surface; and maintenance and protection of completed earthwork . <br /> Payment will be made under : <br /> Item No . 120- 6 - Embankment — Lump Sum <br /> SECTION 234 <br /> SUPERPAVE ASPHALT BASE <br /> A. Sub Article 234- 10 (Page 208) is modified by deleting any reference to adjustment of pay area <br /> and replacing it with the following : <br /> No additional payment will be made for base thickness in excess of the specified thickness <br /> B . Payment shall be made under : <br /> Item No . 285 -7 — Asphalt Base ,Type B - 12 . 5 - Per Square Yard <br /> SECTION 300 <br /> PRIME AND TACK COATS <br /> All prime and tack materials as identified in the 2004 FDOT Road and Bridge Specifications and <br /> 2004 Supplements may be used . Article 300-9 Basis of Payment (Page 209) is deleted and the <br /> following substituted : The quantities to be paid for under this Section shall be included in the cost of <br /> the following contract items : <br /> FAPublic Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04.doc <br /> Page 18 of 58 <br />