Laserfiche WebLink
A . Prime Coat - included in 'Base " Pay Item . <br /> B . Tack Coat - included in "Asphaltic Concrete " Pay Item <br /> C . Bituminous Material (Plant Mix) ( asphalt cement . 20/30) - to be included in Asphaltic <br /> Concrete . <br /> SECTION 327 <br /> MILLING OF EXISTING ASPHALT PAVEMENT <br /> A. Contracor taking ownership of milled material is deleted . Milled material shall be utilized as <br /> indicated in the drawings contained herein . <br /> B . Payment shall be made under: <br /> Item No . 327 -70 — Milling Existing Asphalt Pavement —SY <br /> SECTION 329 <br /> COLD RECYCLED BITUMINOUS BASE COURSE <br /> DESCRIPTION - This work is the in-place construction of a Cold Recycled Bituminous Base Course, <br /> using either reclaimed asphalt pavement (RAP) material and/or reclaimed aggregate material (RAM) , <br /> combined with virgin aggregates and/or bituminous material . It is the intent of this contract to <br /> recycle 100% of the existing asphalt pavement to ensure that the completed recycled base course will <br /> be of a consistent material and thickness throughout . This will include, but is not limited to , all <br /> existing asphalt pavement adjacent to all concrete curbing, storm sewer inlets , manholes, sanitary <br /> sewer manholes, and all utility valve boxes . The existing asphalt pavement in the above-described <br /> locations must be included in the recycling process in order to construct a bituminous base course <br /> with a uniform thickness throughout 100 % of the proposed area. All work on this contract must also <br /> conform to specifications per AASHTO -AGC -ARTBA Task Force 38 Report (available from <br /> American Association of State Highway and Transportation Officials, 444 North Capital Street NW, <br /> Suite 249 , Washington, DC 20001 ) . The intent of this contract is to utilize the specified process <br /> which is clearly defined in Task Force 38 as being a completely separate discipline from Full Depth <br /> Reclamation . Therefore Full Depth Reclamation or any variation of will not be accepted . <br /> FAPublic Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04. doc <br /> Page 19 of 58 <br />