My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-151
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 10:53:08 AM
Creation date
9/30/2015 7:49:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
06/22/2004
Control Number
2004-151
Agenda Item Number
11.I.3
Entity Name
E.J. Breneman
Subject
Milling, Resurfacing, and Shoulder Paving
Addendum No.1
Area
CR 512 from SR 60 to Fellsmere Farms Oslo Rd. 20th ave. to 27th Ave.
Bid Number
6080
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3948
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . Prime Coat - included in 'Base " Pay Item . <br /> B . Tack Coat - included in "Asphaltic Concrete " Pay Item <br /> C . Bituminous Material (Plant Mix) ( asphalt cement . 20/30) - to be included in Asphaltic <br /> Concrete . <br /> SECTION 327 <br /> MILLING OF EXISTING ASPHALT PAVEMENT <br /> A. Contracor taking ownership of milled material is deleted . Milled material shall be utilized as <br /> indicated in the drawings contained herein . <br /> B . Payment shall be made under: <br /> Item No . 327 -70 — Milling Existing Asphalt Pavement —SY <br /> SECTION 329 <br /> COLD RECYCLED BITUMINOUS BASE COURSE <br /> DESCRIPTION - This work is the in-place construction of a Cold Recycled Bituminous Base Course, <br /> using either reclaimed asphalt pavement (RAP) material and/or reclaimed aggregate material (RAM) , <br /> combined with virgin aggregates and/or bituminous material . It is the intent of this contract to <br /> recycle 100% of the existing asphalt pavement to ensure that the completed recycled base course will <br /> be of a consistent material and thickness throughout . This will include, but is not limited to , all <br /> existing asphalt pavement adjacent to all concrete curbing, storm sewer inlets , manholes, sanitary <br /> sewer manholes, and all utility valve boxes . The existing asphalt pavement in the above-described <br /> locations must be included in the recycling process in order to construct a bituminous base course <br /> with a uniform thickness throughout 100 % of the proposed area. All work on this contract must also <br /> conform to specifications per AASHTO -AGC -ARTBA Task Force 38 Report (available from <br /> American Association of State Highway and Transportation Officials, 444 North Capital Street NW, <br /> Suite 249 , Washington, DC 20001 ) . The intent of this contract is to utilize the specified process <br /> which is clearly defined in Task Force 38 as being a completely separate discipline from Full Depth <br /> Reclamation . Therefore Full Depth Reclamation or any variation of will not be accepted . <br /> FAPublic Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04. doc <br /> Page 19 of 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.