My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-151
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 10:53:08 AM
Creation date
9/30/2015 7:49:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
06/22/2004
Control Number
2004-151
Agenda Item Number
11.I.3
Entity Name
E.J. Breneman
Subject
Milling, Resurfacing, and Shoulder Paving
Addendum No.1
Area
CR 512 from SR 60 to Fellsmere Farms Oslo Rd. 20th ave. to 27th Ave.
Bid Number
6080
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3948
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C . Compaction - Provide a compacted layer depth of not less than three inches ( 3 " ) , not <br /> more than five inches ( 5 " ) . After each course has been uniformly spread, allow that <br /> course to cure as necessary prior to the rolling . Roll with rollers meeting the <br /> requirements of FDOT Standard Specifications for Road and Bridge Construction <br /> 2000, Section 330- 11 . Commence rolling at the low side of the course , except leave <br /> three to six inches ( 3 - 6 " ) from any unsupported edge or edges unrolled initially to <br /> prevent distortion . The in-place density of each compacted course will be determined <br /> in accordance with Section 330- 11 .3 . 1 . Density readings will be taken by a licensed <br /> nuclear gauge operator and witnessed by the Inspector. Construct at least two (2 ) <br /> control strips by varying the roller sequence to achieve maximum density. Compact <br /> the remaining recycled mixture to a target density of at least 96% of the highest <br /> average control strip density. Use both a pneumatic tire roller (25 -30 ton) and a steel <br /> roller ( 10 ton or larger) , operated in a vibratory mode in the rolling operation . <br /> D . Finishing - Complete the finishing operation during daylight hours . The roadway must <br /> be open to the traveling public at all times . <br /> E . Protection - As per FDOT Standard Specifications for Road and Bridge <br /> Construction 2000, Section 330- 14 . Protect any finished portion of the base course <br /> upon which construction equipment is required to travel to prevent marring, distortion, <br /> or damage of any kind . Immediately and satisfactorily correct any such damage . <br /> F . Surface Tolerance - As per FDOT Standard Specifications for Road and Bridge <br /> Construction 2000, Section 330- 13 .3 . Check the surface smoothness transversely <br /> with acceptable templates and longitudinally with straightedges in accordance with the <br /> requirements of Section 33043 .3 . Satisfactorily correct any surface irregularity that <br /> exceeds 1 /2 inch under a template or straightedge, and that the engineer deems <br /> obj ectionable . <br /> G . Tests for Depth of Finished Base Course - Determine the depth of Recycled <br /> Bituminous Base Course by cutting or drilling holes to the full depth of the completed <br /> base course . Make one depth measurement for each 500 lineal feet or less of <br /> completed base course . Remove and satisfactorily replace any section deficient 1 /2 <br /> inch or more from the specified depth at no expense to the County. <br /> Start the immediate correction of sections of the base course, which are deficient in <br /> depth at the point of the determined deficiency and proceed longitudinally and <br /> transversely until the base course is found to meet the specifications . <br /> Cut or drill all test holes , backfill with similar and/or acceptable material, and <br /> satisfactorily compact at no expense to the County. This operation will be under the <br /> supervision of the County, who will check the depth for record purposes . <br /> F :\Public Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04. doc <br /> Page 22 of 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.