My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-151
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 10:53:08 AM
Creation date
9/30/2015 7:49:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
06/22/2004
Control Number
2004-151
Agenda Item Number
11.I.3
Entity Name
E.J. Breneman
Subject
Milling, Resurfacing, and Shoulder Paving
Addendum No.1
Area
CR 512 from SR 60 to Fellsmere Farms Oslo Rd. 20th ave. to 27th Ave.
Bid Number
6080
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3948
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H . Base Failure - In the event of any unstable or failed area of the recycled asphalt base <br /> course, the Engineer will determine if the failure is due to the incorrect processing of <br /> the recycled asphalt material or if deeper underlying material or drainage problems are <br /> responsible for the failure . In the event it is determined by the Engineer and the <br /> contractor that the failure is due to the recycled asphalt material being at fault, the <br /> contractor will excavate the failed area and back fill and compact with suitable new <br /> material . If the problem is not due to the recycled asphalt material , then the area will <br /> be excavated and repaired and either a bid pay item or a change order will be used . <br /> I . Maintenance and Traffic - Maintain the completed base course and control traffic as <br /> specified in FDOT Standard Specifications for Road and Bridge Construction <br /> 2000 , Section 102 . Use a pilot car for speed control if damage to the completed base <br /> course, such as raveling, is likely to occur. <br /> J . Traffic Control - Flagging and other traffic control measures shall be in accordance <br /> with FDOT Standard Specifications for Road and Bridge Construction 2000 , <br /> Section 102 . <br /> K. Pre- Construction Testing - The Bidder is required to take representative core samples <br /> of the roads proposed in this contract to insure adequate depth of suitable material for <br /> recycling. The results of these core samples, along with a suggested mix design of <br /> asphalt content must be submitted in a separately sealed envelope at the time of the bid <br /> opening . FAILURE TO COMPLY WILL BE REASON TO REJECT THE BID . <br /> L . Curing - Allow the recycled base course to cure for at least one week before placing <br /> the wearing course . <br /> M . Failure to comply with testing, construction methods or specified equipment will be <br /> cause to terminate contract. <br /> DOCUMENTATION <br /> A . Delivery Tickets - All delivery tickets and notes regarding any materials brought to the <br /> project site to complete this Contract must be given to the County upon delivery to the <br /> project site . These tickets must be signed by an approved representative of the County <br /> at the time of delivery. <br /> B . Meter Readings - Before the start and at the end of each day' s work, the County' s <br /> representative must be permitted access to the mixing equipment in order to read the <br /> meter to verify the quantity of asphalt emulsion applied during the day' s work. <br /> F :\Public Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04.doc <br /> Page 23 of 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.