H . Base Failure - In the event of any unstable or failed area of the recycled asphalt base <br /> course, the Engineer will determine if the failure is due to the incorrect processing of <br /> the recycled asphalt material or if deeper underlying material or drainage problems are <br /> responsible for the failure . In the event it is determined by the Engineer and the <br /> contractor that the failure is due to the recycled asphalt material being at fault, the <br /> contractor will excavate the failed area and back fill and compact with suitable new <br /> material . If the problem is not due to the recycled asphalt material , then the area will <br /> be excavated and repaired and either a bid pay item or a change order will be used . <br /> I . Maintenance and Traffic - Maintain the completed base course and control traffic as <br /> specified in FDOT Standard Specifications for Road and Bridge Construction <br /> 2000 , Section 102 . Use a pilot car for speed control if damage to the completed base <br /> course, such as raveling, is likely to occur. <br /> J . Traffic Control - Flagging and other traffic control measures shall be in accordance <br /> with FDOT Standard Specifications for Road and Bridge Construction 2000 , <br /> Section 102 . <br /> K. Pre- Construction Testing - The Bidder is required to take representative core samples <br /> of the roads proposed in this contract to insure adequate depth of suitable material for <br /> recycling. The results of these core samples, along with a suggested mix design of <br /> asphalt content must be submitted in a separately sealed envelope at the time of the bid <br /> opening . FAILURE TO COMPLY WILL BE REASON TO REJECT THE BID . <br /> L . Curing - Allow the recycled base course to cure for at least one week before placing <br /> the wearing course . <br /> M . Failure to comply with testing, construction methods or specified equipment will be <br /> cause to terminate contract. <br /> DOCUMENTATION <br /> A . Delivery Tickets - All delivery tickets and notes regarding any materials brought to the <br /> project site to complete this Contract must be given to the County upon delivery to the <br /> project site . These tickets must be signed by an approved representative of the County <br /> at the time of delivery. <br /> B . Meter Readings - Before the start and at the end of each day' s work, the County' s <br /> representative must be permitted access to the mixing equipment in order to read the <br /> meter to verify the quantity of asphalt emulsion applied during the day' s work. <br /> F :\Public Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04.doc <br /> Page 23 of 58 <br />