Laserfiche WebLink
MEASUREMENT AND PAYMENT <br /> Price and payment will be full compensation for all materials , labor, coring, testing, mix design , <br /> placement compaction , traffic control , surface protection , and repair of deficient sections . <br /> Measurement of the Cold Recycled Bituminous Base Course is calculated by the square yard of the <br /> original roadway. The payment is made based on what is recycled not what is placed as the final base <br /> course by the paver . <br /> Payment shall be made under : <br /> Item No . 300- 1 - 7 — Emulsified Asphalt — Per Gallon <br /> Item No . 325 -75 — Cold Recycled Bituminous Base Course , 4" — Per Square Yard <br /> SECTION 334 <br /> SUPERPAVE ASPHALT CONCRETE <br /> A . Subarticle 334- 10 (Page 265 ) is modified by the addition of the following : <br /> Included in this payment will be tack coat and bituminous materials (Plant Mix) . No separate <br /> payment or unit price adjustments will be made for bituminous materials . <br /> B . Payment shall be made under : <br /> Item No . 334- 1L — SP - 12 . 5 Level C , Asphaltic Concrete Leveling Course ( 1 . 5 " - 2 . 5 " . ) — Ton . <br /> Item No . 334- 1S — SP - 9 - 5 Level C , Asphaltic Concrete Surface Course ( 1 ") — Ton <br /> SECTION 573 <br /> HYDRO- SEEDING <br /> A. The work specified in this Section shall consist of all materials , labor, equipment , and <br /> supervision necessary to apply a slurry of seed, fertilizer, and mulch to establish a healthy <br /> stand of grass . All sloped areas , such as berms , swales , and banks shall be grassed by hydro - <br /> seeding. <br /> FAPublic Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04.doc <br /> Page 24 of 58 <br />