My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-151
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 10:53:08 AM
Creation date
9/30/2015 7:49:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
06/22/2004
Control Number
2004-151
Agenda Item Number
11.I.3
Entity Name
E.J. Breneman
Subject
Milling, Resurfacing, and Shoulder Paving
Addendum No.1
Area
CR 512 from SR 60 to Fellsmere Farms Oslo Rd. 20th ave. to 27th Ave.
Bid Number
6080
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3948
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEASUREMENT AND PAYMENT <br /> Price and payment will be full compensation for all materials , labor, coring, testing, mix design , <br /> placement compaction , traffic control , surface protection , and repair of deficient sections . <br /> Measurement of the Cold Recycled Bituminous Base Course is calculated by the square yard of the <br /> original roadway. The payment is made based on what is recycled not what is placed as the final base <br /> course by the paver . <br /> Payment shall be made under : <br /> Item No . 300- 1 - 7 — Emulsified Asphalt — Per Gallon <br /> Item No . 325 -75 — Cold Recycled Bituminous Base Course , 4" — Per Square Yard <br /> SECTION 334 <br /> SUPERPAVE ASPHALT CONCRETE <br /> A . Subarticle 334- 10 (Page 265 ) is modified by the addition of the following : <br /> Included in this payment will be tack coat and bituminous materials (Plant Mix) . No separate <br /> payment or unit price adjustments will be made for bituminous materials . <br /> B . Payment shall be made under : <br /> Item No . 334- 1L — SP - 12 . 5 Level C , Asphaltic Concrete Leveling Course ( 1 . 5 " - 2 . 5 " . ) — Ton . <br /> Item No . 334- 1S — SP - 9 - 5 Level C , Asphaltic Concrete Surface Course ( 1 ") — Ton <br /> SECTION 573 <br /> HYDRO- SEEDING <br /> A. The work specified in this Section shall consist of all materials , labor, equipment , and <br /> supervision necessary to apply a slurry of seed, fertilizer, and mulch to establish a healthy <br /> stand of grass . All sloped areas , such as berms , swales , and banks shall be grassed by hydro - <br /> seeding. <br /> FAPublic Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04.doc <br /> Page 24 of 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.