My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-151
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 10:53:08 AM
Creation date
9/30/2015 7:49:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
06/22/2004
Control Number
2004-151
Agenda Item Number
11.I.3
Entity Name
E.J. Breneman
Subject
Milling, Resurfacing, and Shoulder Paving
Addendum No.1
Area
CR 512 from SR 60 to Fellsmere Farms Oslo Rd. 20th ave. to 27th Ave.
Bid Number
6080
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3948
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Materials : <br /> The type and quantity of grass seed shall be as specified in Index 104 of FDOT Roadway and <br /> Traffic Design Standards and shall conform to the requirements of Section 981 of the FDOT <br /> Standard Specifications . <br /> The mulch shall be a wood cellulose fiber especially prepared for use in hydro - seeding, such <br /> as the material supplied by Terra-Mulch ( 800) 726 -6414 and shall be applied in the slurry <br /> mixture at the rates recommended by the manufacturer for the slopes being covered . <br /> The fertilizer shall conform to the requirements of Section 982 of FDOT Standard <br /> Specifications and shall be applied in the slurry mixture at a rate of 1000 pounds per acre . <br /> C . Constriction Methods <br /> The proportions of seed , mulch, and fertilizer shall be mixed with water and other appropriate <br /> components , such as lime tacking agents and growth stimulants , and be applied with <br /> equipment specifically designed for mixing and applying the slurry. The slurry shall be <br /> uniformly applied over the area being covered and provide the specified rates of application . <br /> Work shall be in accordance with the directions of the hydro -seeding equipment <br /> manufacturer, and the material supplier. <br /> D . Basis of Payment <br /> Work and incidental costs specified as being covered under this Section will be paid for at the <br /> contract unit price for the quantities satisfactorily completed and accepted. <br /> Payment shall be made under : <br /> Item No . 753 - 1 — Hydro - Seeding (Bahia) - Per Square Yard <br /> SECTION 575 <br /> SODDING <br /> A . Description : Sod for the project shall be of the variety that is common to the area and of a <br /> variety approved by the Engineer. Where sodding an area in which previously had established <br /> grass the new sod shall be of the same variety as existing (Argentina Bahia) . <br /> C . Work Included : Scope of Work : The work specified in this section consists of the establishing <br /> of a stand of grass , within the project, right-of-way, easements, and other areas indicated <br /> on the Drawings , by furnishing and placing grass sod. Also included are fertilizing, <br /> watering and maintenance as required to assure a healthy stand of grass . <br /> FAPublic Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04. doc <br /> Page 25 of 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.