Laserfiche WebLink
B . Materials : <br /> The type and quantity of grass seed shall be as specified in Index 104 of FDOT Roadway and <br /> Traffic Design Standards and shall conform to the requirements of Section 981 of the FDOT <br /> Standard Specifications . <br /> The mulch shall be a wood cellulose fiber especially prepared for use in hydro - seeding, such <br /> as the material supplied by Terra-Mulch ( 800) 726 -6414 and shall be applied in the slurry <br /> mixture at the rates recommended by the manufacturer for the slopes being covered . <br /> The fertilizer shall conform to the requirements of Section 982 of FDOT Standard <br /> Specifications and shall be applied in the slurry mixture at a rate of 1000 pounds per acre . <br /> C . Constriction Methods <br /> The proportions of seed , mulch, and fertilizer shall be mixed with water and other appropriate <br /> components , such as lime tacking agents and growth stimulants , and be applied with <br /> equipment specifically designed for mixing and applying the slurry. The slurry shall be <br /> uniformly applied over the area being covered and provide the specified rates of application . <br /> Work shall be in accordance with the directions of the hydro -seeding equipment <br /> manufacturer, and the material supplier. <br /> D . Basis of Payment <br /> Work and incidental costs specified as being covered under this Section will be paid for at the <br /> contract unit price for the quantities satisfactorily completed and accepted. <br /> Payment shall be made under : <br /> Item No . 753 - 1 — Hydro - Seeding (Bahia) - Per Square Yard <br /> SECTION 575 <br /> SODDING <br /> A . Description : Sod for the project shall be of the variety that is common to the area and of a <br /> variety approved by the Engineer. Where sodding an area in which previously had established <br /> grass the new sod shall be of the same variety as existing (Argentina Bahia) . <br /> C . Work Included : Scope of Work : The work specified in this section consists of the establishing <br /> of a stand of grass , within the project, right-of-way, easements, and other areas indicated <br /> on the Drawings , by furnishing and placing grass sod. Also included are fertilizing, <br /> watering and maintenance as required to assure a healthy stand of grass . <br /> FAPublic Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04. doc <br /> Page 25 of 58 <br />