Laserfiche WebLink
C . Guarantee : All sodded areas shall be guaranteed for three months after date of final <br /> acceptance . <br /> Replacement of Defective Sod : Any dead sod or sod showing ( less than 95 % of a square ) <br /> indication of probable non survival or lack of health and vigor, or which do not exhibit the <br /> characteristics to meet specifications , shall be replaced within two weeks of notice from <br /> Owner or Engineer. All replacement sod shall be furnished/installed at no additional cost to <br /> the Owner and shall be guaranteed for three months . All replacement shall meet original <br /> specifications . <br /> At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall be <br /> replaced within two weeks . <br /> D . Fertilizer: Commercial fertilizers shall comply with the state fertilizer laws . <br /> The numerical designations for fertilizer indicate the minimum percentages (respectively) of <br /> ( 1 ) total nitrogen, (2) available phosphoric acid and ( 3 ) water- soluble potash contained in the <br /> fertilizer. <br /> The chemical designation of the fertilizer shall be 16 -4- 8 . Fertilizer shall include iron , minor <br /> nutrients and trace elements . At least 50 percent of the nitrogen shall be derived from organic <br /> sources . At least 50 percent of the phosphoric acid shall be from normal super phosphate or an <br /> equivalent source which will provide a minimum of two units of sulfur. The amount of sulfur <br /> shall be indicated on the quantitative analysis card attached to each bag or other container. <br /> Contractor shall ensure 1 pound of nitrogen per 1 , 000 square feet . <br /> E . Water for Grassing : Contractor shall provide the water used in the sodding operations as <br /> necessary to meet the requirements of Article 570 - 5 and 2 . 34 .B . <br /> F . Preparation of Ground : The area over which the sod is to be placed shall be scarified or <br /> loosened to a depth and then raked smooth and free from debris . Where the soil is sufficiently <br /> loose and clean, the Owner, at his discretion, may authorize the elimination of ground <br /> preparation. <br /> G. Application of Fertilizer : Before applying fertilizer, the soil pH shall be brought to a range of <br /> 6 , 0 - 7 , 0 , <br /> Contractor shall apply two (2) applications . The initial shall be fertilizer and the second <br /> application shall be "weed and feed" . <br /> The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds per <br /> acre , or 10 pounds per 1 , 000 square feet, by a spreading device capable of uniformly <br /> distributing the material at the specified rate . <br /> Contractor shall apply applications as per manufacturer' s specification. All tickets from bags <br /> shall be handed over to the County Inspector. <br /> FAPublic Works\Capital Projects\CR 512 & Oslo- Milling, Resurfacing and Shoulder Paving\Bid Document5 . 18 .04 . doc <br /> Page 26 of 58 <br />