Laserfiche WebLink
FLORIDA EAST COAST RAILWAY COMPANY 08/ 12/08 <br /> SAINT AUGUSTINE, FLORIDA <br /> VERO BEACH: INSTALL NEW 146' OMNI CONCRETE CROSSING <br /> 53RD STREET, MP 223+4730' - FDOT # 273108M <br /> FILE: 223/39/4730 <br /> CROSSING DESCRIPTION PAVING DESCRIPTION <br /> Length of Crossing Surface: 146 Tf Width (Across Road) 146 Ft <br /> Number of Tracks: 1 Ea Length (Along Road) 80 Ft <br /> Length of Track Panel: 186 Tf Projected Lift 3 In <br /> AGREEMENT DESCRIPTION GANG DESCRIPTION <br /> Responsible Party: Indian River County 3 Fort Pierce Section <br /> Agreement Date: 14 Fort Pierce Smoothing <br /> Division of Responsibility 0 Crane <br /> Encase Fiber Optic Cable County 0 Loader <br /> Maintenance of Traffic County <br /> Crossing Surface County <br /> Track Materials County <br /> Track Construction County <br /> Paving County <br /> Overtime N/A <br /> COST RECAPITULATION 10.00% Responsible <br /> Track & Civil Work Item Labor Equipment Material Contract Contingency Total Part <br /> Encase Fiber Optic Cable n/a n/a n/a 24,750.00 25550. 00 27,300.00 County <br /> Mobilization/Material Consolidation 2, 126.08 3,373. 80 n/a n/a 600. 12 6, 100.00 County <br /> Construct Track Panel & Place 2,280. 11 3 ,659.92 11 , 118.68 n/a 1 ,741 .29 1800. 00 County <br /> Maintenance of Traffic/Police Protection n/a n/a n/a 1200. 00 1 ,300. 00 149100. 00 County <br /> Remove Crossing Surface 0.00 0.00 n/a n/a 0.00 0.00 County <br /> Remove/Replace Structure 3 ,374.08 6,489.68 n/a 3 ,000. 00 1 ,336.24 14,200.00 County <br /> Line & Surface Track 822. 93 1 ,668.06 131335 . 14 n/a 15673 . 87 17,500. 00 County <br /> Replace Crossing Surface, As Needed 31579. 53 5,745. 68 59, 138. 53 n/a 6,936.26 755400.00 County <br /> Place Asphalt 182. 75 57. 12 n/a 435800. 00 4,460. 13 48,500.00 County <br /> Site Cleanup 670. 69 829.08 n/a n/a 200. 23 15700. 00 County <br /> Overtime Charge for Weekend Work n/a n/a n/a n/a 0. 00 0.00 N/A <br /> ---------- ---------- ....---... ---------- ---------- .......... <br /> Totals: 132036. 16 21 ,823 .35 83,592. 36 845350.00 20,798. 14 2231600.00 <br /> TRACK & CIVIL PROJECT COST : $223,600.00 1 ,531 . 51 $/Ft <br /> ENGINEERING & SUPERVISION : 89944.00 <br /> TOTAL CROSSING SURFACE COSTS: $2329544.00 <br /> NORTH GIFFORD CONTROL POINT UPGRADES: $2279000.00 <br /> TOTAL SIGNAL IMPROVEMENT PROJECT COST: 467,100.00 <br /> COST TO BE BORNE BY INDIAN RIVER COUNTY: $9269644.00 <br /> NOTE : THE ABOVE IS AN ESTIMATE ONLY, ALL CHARGES WILL BE BASED ON ACTUAL COST <br /> EXHIBIT " B " Model Lest Revised 12/18/00 <br />