My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018A.
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 11:11:16 AM
Creation date
9/30/2015 8:08:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018A.
Agenda Item Number
7.M.
Entity Name
Kimley-Horn Associates, INc
Subject
documents and specifications for canal bridge replacement
Area
Oslo Road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />4.02 Days to Achieve Substantial Completion and Final Payment <br />A. The bridge -culvert Work will be substantially completed on or before the 120th day after <br />the Notice to Proceed and shall include canal flow re-establishment of Lateral "J" Canal <br />and adjacent sublaterals, without relying on mechanical or other temporary measures. <br />B. The Work will be substantially completed on or before the 180th day after the date when <br />the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />14.07 of the General Conditions on or before the 210th day after the date when the <br />Contract Times commence to run. <br />4.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and <br />that OWNER will suffer financial loss if the Work is not completed within the times <br />specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with <br />Article 12 of the General Conditions. The parties also recognize the delays, expense, and <br />difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if <br />the Work is not completed on time. Accordingly, instead of requiring any such proof, <br />OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a <br />penalty), CONTRACTOR shall pay OWNER $800.00 for each calendar day that expires <br />after the time specified in paragraph 4.02 for Substantial Completion until the Work is <br />substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, <br />refuse, or fail to complete the remaining Work within the Contract Time or any proper <br />extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $500.00 for <br />each calendar day that expires after the time specified in paragraph 4.02 for completion <br />and readiness for final payment until the Work is completed and ready for final payment. <br />ARTICLES =CONTRACT PRICE <br />5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the <br />Contract Documents, an amount in current funds equal to the sum of the amounts <br />determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.8, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract:: <br />Numerical Amount: $2,188,848.87 <br />Written Amount: <br />TWO MILLION, <br />ONE <br />HUNDRED EIGHTY-EIGHT <br />THOUSAND, <br />EIGHT -HUNDRED <br />FORTY <br />EIGHT <br />DOLLARS & EIGHTY-SEVEN <br />CENTS <br />00520 - Agreement (Public Works) 2006041.doc <br />00520-3 <br />F:\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS 2006041\00520 - Agreement (Public Works) 2006041.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.