My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018A.
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 11:11:16 AM
Creation date
9/30/2015 8:08:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018A.
Agenda Item Number
7.M.
Entity Name
Kimley-Horn Associates, INc
Subject
documents and specifications for canal bridge replacement
Area
Oslo Road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EM <br />ARTICLE 6 = PAYMENT PROCEDURES <br />6.01 Submittal and Processing of Payments <br />A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the <br />General Conditions. Applications for Payment will be processed by ENGINEER as <br />provided in the General Conditions. <br />6.02 Progress Payments; Retainage <br />A. OWNER shall make progress payments on account of the Contract Price on the basis of <br />CONTRACTOR's Applications for Payment at intervals not less than once each month <br />during performance of the Work as provided in paragraph 6.02.A.1 below. All such <br />payments will be measured by the schedule of values established in paragraph 2.07.A of <br />• the General Conditions (and in the case of Unit Price Work based on the number of units <br />completed) or, in the event there is no schedule of values, as provided in the General <br />Requirements: <br />1. Progress payments will be made in an amount equal to the percentage indicated <br />below but, in each case, less the aggregate of payments previously made and less <br />such amounts as ENGINEER may determine or OWNER may withhold, in accordance <br />with paragraph 14.02 of the General Conditions: <br />a. Ninety percent (90%) of Work completed (with the balance being retainage); and <br />b. Eighty percent (80%) of cost of materials and equipment not incorporated in the <br />Work but stored on the Project site (with the balance being retainage). <br />6.03 Final Payment <br />A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of <br />the General Conditions, OWNER shall pay the remainder of the Contract Price as <br />recommended by ENGINEER as provided in said paragraph 14.07. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br />paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br />ARTICLE 8 = CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />00520 - Agreement (Public Works) 2006041 <br />00520-4 <br />F:\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS 2006041\00520 -Agreement (Public Works) 2006041.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.