Laserfiche WebLink
W <br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of <br />subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br />in or relating to existing surface or subsurface structures at or contiguous to the Site <br />(except Underground Facilities) which have been identified in the Supplementary <br />Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and <br />drawings of a Hazardous Environmental Condition, if any, at the Site which have been <br />identified in the Supplementary Conditions as provided in paragraph 4.06 of the General <br />Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all examinations, investigations, explorations, tests, studies, and data concerning <br />conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect <br />of the means, methods, techniques, sequences, and procedures of construction to be <br />employed by CONTRACTOR, including applying the specific means, methods, <br />techniques, sequences, and procedures of construction, if any, expressly required by the <br />Contract Documents to be employed by CONTRACTOR, and safety precautions and <br />programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />.� H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the <br />Contract Documents, and all additional examinations, investigations, explorations, tests, <br />studies, and data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. Section 00520 — Agreement (pages 00520-1 to 00520-8, inclusive); <br />2. Section 00610 — Performance Bond (pages 00200-1 to 00200-5, inclusive); <br />3. Section 00612 — Payment Bond (pages 00612-1 to 00612-5, inclusive); <br />4. Section 00620 — Sample Certificate of Liability Insurance (page 00620-1); <br />5. Section 00622 — Contractor's Application for Payment (pages 00622-1 to 00622-3, <br />inclusive); <br />00520 - Agreement (Public Works) 2006041 <br />00520-5 <br />F:\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS 2006041\00520 - Agreement (Public Works) 2006041.doc Rev. 05/01 <br />