Laserfiche WebLink
Elm <br />6. Section 00630 — Certificate of Substantial Complete (pages 00630-1 to 00630-2, <br />inclusive); <br />7. Section 00632 — Contractor's Final Certification of Work (pages 00632-1 to 00632-2, <br />inclusive); <br />8. Section 00634 — Professional Surveyor and Mapper's Certification (page 00634-1); <br />9. Section 00700 — General Conditions (pages 00700-1 to 00700-44, inclusive); <br />10. Section 00800 — Supplementary Conditions (pages 00800-1 to 00800-14, inclusive); <br />11. Specifications as listed in the table of contents of the Project Manual; <br />12. Drawings consisting of a cover sheet and sheets numbered 1 through 24, inclusive, <br />with each sheet bearing the following general title: Oslo Road (CR 606) / Lateral `J' <br />Canal Bridge Replacement Plans; <br />13. Addenda (numbers to inclusive); <br />14. Exhibits to this Agreement (enumerated as follows): <br />a. Section 00100 — Advertisement (pages 00100-1 to 00100-2, inclusive); <br />b. Section 00200 — Instructions to Bidders (pages 00200-1 to 00200-12, inclusive); <br />c. Section 00300 — Bid Package (page 00300-1); <br />d. Section 00310 — Bid Form (pages 00310-1 to 00310-8, inclusive); <br />e. Section 00430 — Bid Bond (pages 00430-1 to 00430-4, inclusive); <br />f. Section 00450 — Statement of Public Entity Crime (page 00450-1); <br />g. Section 00452 — Sworn Statement Under Section 105.08, Indian River County <br />Code, on Disclosure of Relationships (pages 00452-1 to 00452-2, inclusive); <br />h. Section 00454 — Sworn Statement Under the Florida Trench Safety Act (pages <br />00454-1 to 00454-2, inclusive); <br />i. Section 00456 — Qualifications Questionnaire (pages 00456-1 to 00456-4, <br />inclusive); <br />j. Section 00458 — List of Subcontractors (page 00458-1); <br />k. Section 00510 — Notice of Award (pages 00510-1 to 00510-2, inclusive); <br />10. The following which may be delivered or issued on or after the Effective Date of the <br />Agreement and are not attached hereto: <br />a. Written Amendments; <br />b. Work Change Directives; <br />c. Change Order(s). <br />B. The documents listed in paragraph 9.01.A are attached to this Agreement (except as <br />expressly noted otherwise above). <br />C. There are no Contract Documents other than those listed above in this Article 9. <br />D. The Contract Documents may only be amended, modified, or supplemented as provided <br />in paragraph 3.04 of the General Conditions. <br />00520 - Agreement (Public Works) 2006041 <br />00520-6 <br />er FAPublic Works\Capital <br />Projects\Oslo <br />Road Lateral J\BID DOCUMENTS 2006041\00520 - Agreement <br />(Public <br />Works) 2006041.doc Rev. 05/01 <br />