Laserfiche WebLink
o -o ? � <br /> ADDENDUM #6 TO CONTRACT DATED JANUARY 21 , 1997 BETWEEN INDIAN RIVER <br /> COUNTY AND MASTELLER & MOLER, INC. FOR CR 512 PAVING & DRAINAGE <br /> IMPROVEMENTS <br /> INDIAN RIVER COUNTY PROJECT #9611 <br /> COUNTY ROUTE 512 CORRIDOR IMPROVEMENTS <br /> ROSELAND ROAD TO I-95 <br /> INDIAN RIVER COUNTY, FL <br /> I. ADDITIONAL SERVICES IN CONNECTION WITH THE FOLLOWING CONSTRUCTION <br /> PLAN PREPARATION SERVICES . <br /> Masteller & Moler, Inc. has completed the design of the stormwater improvements for the County Route 512 <br /> Corridor Improvements . The roadway improvements are supported by five (5) separate stormwater <br /> management basins designated as Basins A, B , C , D, & E . This scope of services relates to the completed <br /> stormwater management design for Basin D within the County Route 512 Corridor Improvements project. <br /> The Basin D stormwater lake is proposed to be situated on the south side of CR512 between County Route <br /> 510 and the St. Sebastian River Bridge. A private developer has proposed a single-family home subdivision <br /> known as Sebastian Landings on a portion of lands within the CR 512 project that were proposed to be <br /> utilized for Stormwater Lake D . It has been determined to be in the County ' s best interest to coordinate the <br /> designs of the stormwater systems supporting both projects. In order to properly coordinate the designs <br /> between the two projects, we shall perform the following services : <br /> Scope of Services <br /> Under this task, a re-analysis shall be completed to consider coordinating the design of the CR512 Basin D <br /> stormwater improvements with the proposed Sebastian Landings project stormwater design. We shall <br /> evaluate the feasibility for raising the treatment volume vertical storage limit by elimination of the proposed <br /> Lake D littoral zone. This would allow for use of a more compact parcel of land to support Drainage Basin <br /> D in the CR 512 project. We shall also complete an evaluation of the required treatment system necessary to <br /> provide for contributing stormwater drainage sheds from both the CR512 and Sebastian Landings site to a <br /> common stormwater lake . We shall also develop amended stormwater modeling within ICPR to verify that <br /> the design of the modified Lake D stormwater lake has sufficient capacity to attenuate the post-development <br /> peak runoff to pre-development rates. <br /> We shall meet with County staff and the private developer to coordinate acceptance of the modified design <br /> for Stormwater Lake D . Following acceptance of the modified preliminary design, we shall finalize the <br /> amendments to the Construction Plans and the stormwater management report for the CR512 project. The <br /> Construction Plans Sheets that will be amended will be, as a minimum : <br /> • Plan & Profiles ( 15 & 16) <br /> • Summary of Pay Items <br /> • Summary of Drainage Quantities <br /> • Drainage Map <br /> • Pond "D" Details <br /> • Cross-sections . <br />