Laserfiche WebLink
SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> ' A. Incase of discrepancy , the governing order of the documents shall be as follows : <br /> 1 Written Interpretations <br /> ' 2 . Addenda <br /> 3 . Specifications <br /> ons to the General Conditions <br /> 4 , Supplementary Conditi <br /> 5 . General Conditions <br /> ' 6 . Approved Shop Drawings <br /> 7 . Drawings <br /> g , Referenced Standards . <br /> B . <br /> Written/computed dimensions shall govern over scaled dimensions . <br /> rSC -4 . 02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4 . 02. 8 : <br /> C , In the preparation of Drawings and Specifications ,of explorations andrtests of ENGINEER' s <br /> Consultants relied upon the following reports <br /> subsurface conditions at the Site : <br /> r 1 . Report dated 10- 17-2000 , prepared <br /> eerbn DServeces foe Jungle Trail/ Pel can lburgr Engineering Ing <br /> Inc. , entitled : Geotechnical Engin g <br /> Island Wildlife Refuge , Indian River County , Florida , consisting of <br /> ' 27 pages . <br /> D . Copies of reports and drawings itemized in SC-4 • lndian Rivet County nd SC-4 . 0 . D that re not <br /> included with Bidding Documents may be examined at <br /> Works Department, Engineering Division during regular business hours . These <br /> "technical data" <br /> reports and drawings are not part of the Contract DOeoy as identso entified ut and established <br /> ' contained therein upon which CONTRACT Y <br /> above are incorporated therein by reference . <br /> isfact <br /> E . The CONTRACTOR shall be responsiblehe nature having loermcation of the workned to , theconformation <br /> ' prior to the submission of his bid , and and quantity of <br /> of the ground , the character and quality of the substrata , the types <br /> materials to be encountered , the natueo a ground exlecution of the work , <br /> character <br /> of equipment and facilities needed preliminaryond during the <br /> the general and location conditions and <br /> stabl sh d for the wother matters which <br /> ork to be donw Ilcan in any way eeflect <br /> the work under this contract. The price e <br /> tall costs pertaining to the work, insofar as twiork done the Eng neer) and drawings tion is reasonaby e <br /> from an inspection of the site , explanatory <br /> and specifications included in the oldpackage ,rations made) neer and owner by the CONTRACTOR <br /> no <br /> responsibility for any conclusions P <br /> based on information made available by the Engineer. <br /> 0386-00800 - supplementary Conditions <br /> 008002 - <br /> F •\Fno;neerine\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-00800 Supplementary <br />