My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01009 <br /> ' SPECIAL PROVISIONS <br /> ' 1 . 1 GENERAL <br /> A . Visits to the construction site may be made by representatives of permitting or <br /> ' governing bodies . Submit details of all instructions from the above to the <br /> ENGINEER immediately . The Work will not be accepted by the OWNER until final <br /> acceptance has been received from the various Regulatory Agencies having <br /> jurisdiction . <br /> B . Furnish sufficient labor, construction equipment and materials , and work such <br /> hours , including night shifts and overtime operations , as may be necessary to insure <br /> the prosecution of the work in accordance with the approved progress schedule . If, <br /> in the opinion of the ENGINEER , the CONTRACTOR falls behind the progress <br /> schedule , take such steps as may be necessary to improve progress , all without <br /> additional cost to the OWNER . The ENGINEER shall be compensated for his <br /> overtime services in accordance with the Supplementary Conditions . <br /> 1 . Failure to comply with the requirements of the ENGINEER under this <br /> provision shall be grounds for determination by the ENGINEER that the <br /> CONTRACTOR is not prosecuting the work with such diligence as will insure <br /> completion within the time specified . Upon such determination , the <br /> ENGINEER may recommend to the OWNER to seek such legal remedy as is <br /> deemed necessary to protect the OWNER' s interest . <br /> C . All salvageable material and equipment for which specific use , relocation or other <br /> disposal is not specifically noted , shall remain the property of the OWNER and shall <br /> ' be delivered to the OWNER at the following location : <br /> at the CONTRACTOR ' s expense . All <br /> material and equipment not in salvageable condition , as determined by the <br /> ENGINEER and the OWNER , shall be disposed of by the CONTRACTOR , at the <br /> CONTRACTOR's expense . <br /> ' D . Requirements of Permits or Grants : In addition to these Specifications , all work shall <br /> comply with the requirements of local permitting agencies , St . Johns River Water <br /> Management District , Florida Department of Environmental Protection , Florida <br /> Department of Transportation , and all other state or federal agencies ' permit or <br /> grant requirements . If there is a conflict between the Specifications and any permit <br /> or grant requirement , then the most stringent specification or requirement shall <br /> ' govern . In any event , the ENGINEER shall determine which specification or <br /> requirement governs , and the ENGINEER' s decision shall be final . <br /> ' E . Other Specifications and Requirements : In some instances , the Specifications <br /> Last revised 12/10/02 01009- 1 PROJECT <br /> ' F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-01009 - Special <br /> Provisions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.