Laserfiche WebLink
specifications (such as FDOT' s <br /> contained he may refer to other requirements or sp I f there is a conflict <br /> erenced specification or requirement , thee <br /> Standard S ecifications for Road and <br /> Brid a Construction t th <br /> between the Specifications and any event , <br /> most stringent specification or requirement <br /> peci ica on orarelquirementlgoverns , and the <br /> thetermine ecifica <br /> ENGINEER shall <br /> neon shall be finals p <br /> ENGINEER' s <br /> ' iof intention to begin construction . <br /> F . Notify all permitting agencies <br /> Give proper <br /> notification within the time frame required by the agency . <br /> G . Give the ENGINEER ten ( 10 ) days minimum notice before beginning work on the <br /> Project , an test . <br /> H . Give the ENGINEER a minimum of 48 hours notice before performing Y <br /> secure <br /> performing any work outside the designated limit cable ows of the ner ,site , sec in <br /> t I Before pert anysaid <br /> any necessary permits and authorization from the applicable <br /> writing that such has been previously obtained . Follow all requirements <br /> owner term ( 10 ) days <br /> permits or authorization . Give the ENGINEER and app <br /> commencing construction operations outside the designated <br /> minimum notice before <br /> limits of the work site . <br /> o so by OWNER . If overtime is <br /> • Do not work overtime unless authorized to the ENGINEER ,required , provide 48 hours minim <br /> work on holidays or weekends that requires inspecermissioon by n <br /> K . Do not perform any the OW NER' s written p <br /> ENGINEER or OWNER , without first obtaining prawings , or shown <br /> d in the Specifications and not shown in the <br /> Anything mentioned <br /> mentioned in the Specifications , shall be of like effect as if <br /> in the Drawings and <br /> shown or mentioned in both . <br /> proceed in the sequence listed in Section <br /> The items of work on this project are top operable within the time frame <br /> ' M operations" and shall be op work that involves <br /> 01014 , " Maintenance of Op <br /> until written approval and authorization has been <br /> stated from the date of the Notice to Proceed . Do not start any approval <br /> modification to existing facilities , u OWNER a minimum of 48 hours <br /> ' d from the OWNER or his designated representative . After written p <br /> ' receive give th <br /> and authorizationnoteefore starting any g <br /> . e has an work that involves modifications to existing <br /> advance notice <br /> facilities . <br /> + + END OF SECTION + + <br /> 01009-2 <br /> PROJECT ecial <br /> Last revised 716101 land Restoration\0386-Pelican Island -Contract Docs\0386-01009 - p <br /> FAEngineering\Capital Projects\0386-Pelican Island Up <br /> ' Provisions .doc <br />