Laserfiche WebLink
' responsibility for the maintenance of barricades , signs , lights , and for providing <br /> watchmen shall continue until OWNER accepts the Project . <br /> 1 . 3 TREE AND PLANT PROTECTION <br /> A . Protect existing trees , shrubs' and in a on or a nst u1nnecessary cuttingabreacent to the site <br /> tht raking or shown or designated to remain p 9 <br /> skinning of trunk , branches , bark or roots . <br /> ' B . Do not store or park materials or equipment within the drip line . <br /> C . Install temporary fences or barricades to protect trees and plants in areas <br /> ' subject to traffic . <br /> D , Fires shall not be permitted under or adjacent to trees and plants . <br /> E . Within the limits of the Work , water trees and plants that are to remain , in order <br /> to maintain their health during construction operations . <br /> cont <br /> nuously <br /> F . Cover all exposed roots with burlap' ands ep ble . itProteict root systems fromwet , Cover <br />atl exposed roots with earth as soon as po <br /> mechanical damage and damage by erosion , flooding , run -off or noxious <br /> materials in solution . <br /> ' <br /> G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> ' replace them with a specimen of equal or better quality . <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> P ROTECTION OF IRRIGATION <br /> 1 . 4 <br /> The CONTRACTOR shall be responsible fo maintaining <br /> nt could din good amaged condition all <br /> irrigation systems within the easements , which <br /> by <br /> construction activities . The CONTRACTOR shall repair any irrigation systems <br /> ' damaged by construction activities within two (2 ) days . Irrigation systems <br /> partially within the right-of-way of Kings Highway and all intersecting side streets <br /> within project limits may be cut off and capped or connected to same system to <br /> ' maintain functionality . The CONTRACTOR he sl stem l be responsible <br /> t should fallnouitsideiog <br /> the functionality of the remaining portion o Y <br /> the right-of-way . <br /> 1 . 5 PROTECTION OF EXISTING STRUCTURES <br /> 01541 Protection of Work <br /> ' 01541 -2 <br /> FAEngineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-01541 Protection of <br /> Property.doc <br />