Laserfiche WebLink
Structures :q , Underground but not be limited to , all <br /> 11 , Underground structures are dei i ng, Land manholes , chambers , electrical al <br /> sewer , water , gas , and of p p <br /> conduits , tunnels and other existing subsurface work located within 1 <br /> cent to the limits of the Work . <br /> 2 . <br /> All underground structures known to ENn I telephone are sshown , This <br /> connections for water , sewer , electric , a <br /> in <br /> ' <br /> information is shown for the assistance of CONTRACTOR to be correct oe <br /> with the best information available , but is the <br /> guaranteed <br /> ngs are <br /> complete . The he existing utilities shown on the ContracERrat tihe time the <br /> ated <br /> according to the information have <br /> according been independently verifble to t ied by the <br /> ' Drawings were prepared and ha <br /> tee is <br /> OWNER or the ENGINEER . Guarannot <br /> of hose shown are <br /> underground utilities are shown or that the ng purposes only . Finding the <br /> accurate . The locations showutiliities is theare for iCONTRACTOR' s responsibility <br /> actual location of any existing work in the vicinitys <br /> and shall be done before it commences any CONTRACTOR <br /> failure to <br /> e the CONTRACTOR shall be fully respRAible for any and all <br /> Furthermore , the CONT <br /> damages , which might be occasioned <br /> all underground utilities . The OWNER <br /> exactly locate and preserve any damages sustained or costs <br /> or ENGINEER will assume no liability for anydamages <br /> in the vicinity of <br /> incurred because of the CONTRA or tem operations <br /> and shoring of <br /> existing utilities or structures , nor for temporary utilit contact the utility <br /> same . If it is necessary to shore , brace , or swing a Y <br /> or department affected and obtain their permission regarding the <br /> company p <br /> method to use for such work .companies which may have buried or aerial <br /> 3 , Contact the various utility comp work , <br /> utility companies prior to beginning <br /> utilities within or near the construction all <br /> before commencing <br /> i Provide 48 hours minimum notice t <br /> construction . existing utilities in order to minimize <br /> 4 , Schedule and a ue tion of services .te all work existing <br /> such interruption is <br /> ' necessary interruption the ENGINEER and the <br /> necessary <br /> for completion of the work , notify <br /> ction of the appropriate utility . <br /> appropriate utility at least 48 hours i in <br /> avance . Perform all work o <br /> pp <br /> repair/restore utility service to the sa tion , and <br /> Include all costs related to service <br /> item in the Contract ,up <br /> restoration in the appropriate house business services , <br /> ' 5 , Where it is necessary to temporarily interrupt oboth before the <br /> the owner or occupant , <br /> the CONTRACTOR shall notify and again immediately before service is <br /> interruption (24 -hour minimum ) , nd pipes or cables , the CONTRACTOR <br /> resumed . Before disconnecting iaowner , or shall make suitable <br /> shall obtain permission their owner . <br /> arrangement for their disconnection by prevent <br /> of trenching and excavation work and uncover all obstructing <br /> i 6 . Explore aheadto determine their location , to p <br /> underground structures sufficiently vent interruption of the services which such <br /> damage to them and to p <br /> structures provide . If CONTRACTOR damages <br /> a under ground structure , <br /> res condition at CONTRACT <br /> restore it to original 01541 Protection of work <br /> ' 01541 -3 <br /> 'ects\0386-Pelican Island Upland Restoration\0386-Pelican is -Contract Docs\0386-01541 Protection of <br /> F :\Engineering\Capital Prol <br />