Laserfiche WebLink
meeting appropriate federal , state , and local regulations and water quality <br /> t standards , such as turbidity . All disturbed areas <br /> ill be replanted withgraagproved <br /> ed <br /> vegetation cover (either final or temporary) with days f fin <br /> ' A . Preconstruction Conference : at the preconstruction conference the <br /> Contractor shall present, in writtenform , <br /> of erosion plans and water pollules ution . <br /> onfor <br /> prevention , control , and abatement <br /> B . Ditches , Streams and Canals : staked and floating turbidity barriers shall <br /> be installed in all permanent water course in a manner so as not to act as <br /> a dam . Barriers shall be located at a distance of no greater than 25 feet <br /> downstream from the last point of construction . <br /> ' C . Silt Fences : Silt fences shall be installed to prevent silt and erosion from <br /> leaving the project limits particularly adjacent to wetlands , roadside <br /> ' ditches or existing bodies of water . <br /> m sewer system <br /> D , Storm sewer System : The' Contractor shall olt uct on This rmay include the from erosion <br /> and sedimentation duringns <br /> use of baled hay , silt fences or any other method approved by the <br /> Engineer . All such costs associated with colnstruct d item be damaged s shall be included in the it <br /> cost of <br /> storm sewer system . Should any <br /> ce the <br /> due to erosion or sedimentation , the Contractor <br /> w and existing (wherair or e called <br /> ' item with no additional compensation . <br /> for) storm sewer pipes shall be clean and free from silt prior to final <br /> ' acceptance . <br /> E . Non-Compliance : Should the Owner °nainga red in determine <br /> accordancewith the <br /> control within therosion <br /> e project is not being <br /> ' FDOT indexes and specifications , the contractor shall have until the end of <br /> the working day in which notification is given to take modification therective action . <br /> Owner shall have <br /> Should the contractor fail to make such <br /> ' the option to fine the contractor $400 per day until remedied . <br /> ' F . Compensation : All payment for the above items shall be made under <br /> item : Staked Turbidity Barrier — Per Linear Foot <br /> + + END OF SECTION <br /> ' TECHNICIAL PROVISIONS <br /> TP- 2 <br /> ' ro 'ects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-Technical Provisions.doc <br /> F :\Engineering\Capital P J <br />