My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0386 -Technical Specifications <br /> CLEARING AND GRUBBING <br /> 1 . SCOPE <br /> A. The Contractor shall furnish all labor, materials and equipment, and all <br /> operations required to clear and grub the site as shown on the Plans and <br /> ' specified herein. <br /> 2 . GENERAL <br /> A . Clearing and grubbing shall consist of the complete removal and disposal <br /> of citrus trees, Brazilian pepper trees, their associated stumps and root <br /> ' structures , rubbish, concrete and other deleterious material and <br /> obstructions resting upon or protruding through the surface of the ground, <br /> including exposed citrus irrigation lines and pipes . Stumps , roots 3 " and <br /> over and similar obstructions shall be removed to a minimum depth of 2 <br /> feet below the existing ground. <br /> B . In clearing citrus tree areas , native plants and trees are to remain . <br /> Transplanting of trees is not included in this scope of work. If a mature <br /> native tree is encountered that interferes with the Contractor' s duties , the <br /> ' Contractor shall notify the County Representative . <br /> C . In the citrus tree area designated in the Plans for the Contractor to <br /> ' selectively clear, the Contractor shall contact the County Representative <br /> for instruction as to what citrus trees are to be removed. All Brazilian <br /> pepper trees in this area are to be removed. <br /> ' D . On the project site there are irrigation pipes protruding from the ground <br /> which are outside of designated clearing areas but within the areas to be <br /> planted. As noted in the Plans , Contractor shall remove the above- ground <br /> portions of these PVC pipes and valves to a minimum depth of 2 feet <br /> below the existing ground and dispose of them off site . Contractor is not <br /> ' responsible for removing buried, horizontal runs of these irrigation pipes <br /> except where they are uncovered in the excavation of the Aquatic Habitats <br /> ' and Ephemeral Ponds . <br /> E . Because the excavation areas for designated aquatic habitats and <br /> ephemeral ponds have already been cleared of citrus trees , separate <br /> grubbing and clearing operations will not be necessary. However, the <br /> Contractor shall separate foreign material such as irrigation pipes from the <br /> ' excavated soil. <br /> 0386-Technical Specifications <br /> - 1 — <br /> ' FAEngineering\Capital Projects\0386-Pelican Island Upland Restora6on\0386-Pelican Island -Contract Docs\0386-Technical <br /> Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.