My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0386 -Technical Specifications <br /> F . The Contractor shall clear and grub the areas described below : <br /> 1 , Citrus tree areas designated in the Plans . <br /> ' 3 , DISPOSAL <br /> A. BURNING <br /> 1 . Trees , stumps , brush, weeds and similar natural materials shall be <br /> piled in burn areas as designated in the Plans . The USFWS will <br /> ' burn the piled material and obtain the necessary permit to do so . <br /> B , OFF - SITE DISPOSAL <br /> 1 . Rubbish, concrete , irrigation lines , PVC pipe, metal, tires , drums , or <br /> any other material which does not burn or would cause air pollution if <br /> burned shall be hauled off-site by the Contractor for disposal in an <br /> approved manner. All related fees shall be paid by the Contractor. No <br /> such material shall be buried on-site . <br /> ' EXCAVATION <br /> SCOPE <br /> A, The Contractor shall furnish all necessary labor, equipment, and <br /> transportation to excavate and haul material in accordance with the Plans <br /> and Specifications . <br /> ' 2 , GENERAL <br /> A, The Contractor shall excavate for the aquatic shots and wn in the Plansand <br /> ' ponds and dispose of all materials excavated as <br /> specified herein. <br /> ' 3 , DISPOSAL <br /> A. In all areas where excavation atbe done , all earth, rock, muck separated from unsuitable material <br /> and' <br /> strippings shall be remove <br /> requiring off-site disposal as defined herein. <br /> B , The Contractor may, for his own convenience, elect to temporarily <br /> ted <br /> stockpile any portion' oerhfor later or disposals The stockpiled te location designated by the <br /> Own , <br /> 0386-Technical Specifications <br /> - 2 - <br /> F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-Technical <br /> Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.