My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0386 -Technical Specifications <br /> site all plant staking and irrigation materials if either has been installed. <br /> ' PART 2 - PRODUCTS <br /> 1 . MATERIALS <br /> ' A. NOMENCLATURE : Conform to the names given in Standardized Plant Names , <br /> 1942 Edition, prepared by the American Joint Committee on Horticultural <br /> ' Nomenclature . Names of varieties not included therein, conform generally with <br /> names accepted in the nursery trade . <br /> B . MEASUREMENTS : Plants shall be measured when branches are in their normal <br /> position. Height and spread dimensions specified refer to main body of plant and <br /> not extreme branch tip to tip . The measurements specified are the minimum size <br /> acceptable and are the measurements after pruning, where pruning is required. <br /> C . B & B PLANTS : No plant shall be accepted when the ball of earth surrounding <br /> its roots has been cracked or broken . The diameter of the ball must be sufficient <br /> ' to encompass the fibrous and feeding root system necessary for the maximum <br /> development of the plant . Root pruning shall have been done at a minimum of <br /> ' four (4) weeks before planting at the job . <br /> D . MATERIALS : Pot bound plant materials will be unacceptable. <br /> E . PALMS : Boots shall remain on all palms for their entire height. <br /> ' 2 . BACKFILL <br /> A . Excavated material from digging receiving holes for the plants shall be used as <br /> backfill material. Fertilizer or soil mixes shall not be used. <br /> PART 3 - EXECUTION <br /> 1 . PREPARATION <br /> ' A . PLANT PITS : Circular pits with vertical sides shall be excavated for all plants . <br /> Diameter of pits for trees , shrubs, and ground cover shall be at least two times <br /> ' greater than the diameter of the ball . <br /> ' 0386-Technical Specifications <br /> - 9 - <br /> ' FAEngineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-Technical <br /> Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.