r40C-4 . 900 (3) indicating the actual start date and the expected completion date . <br /> ' 7 . When the duration of construction will exceed one year, the permittee shall submit <br /> construction status reports to the District on an annual basis utilizing an Annual Status <br /> ' Report Form No . 50C-4 . 900 (4) . These forms shall be submitted during June of each year. <br /> Be For those systems which will be operated or maintained by an entity which will require an <br /> ' easement or deed restriction in order to provide that entity with the authority necessary <br /> to operate or maintain the system , such easement or deed restriction , together with any <br /> ' other final operation or maintenance documents as are required by subsections 7 . 1 . 1 <br /> through 7 . 1 . 4 of the Applicant's Handbook : Management and Storage of Surface Waters , <br /> must be submitted to the District for approval . Documents meeting the requirements set <br /> ' forth in these subsections of the Applicant' s Handbook will be approved . Deed <br /> restrictions , easements and other operation and maintenance documents which require <br /> ' recordation either with the Secretary of State or the Clerk of the Circuit Court must be <br /> so recorded prior to lot or unit sales within the project served by the system , or upon <br /> ' completion of construction of the system , whichever occurs first. For those systems <br /> which are proposed to be maintained by county or municipal entities , final operation and <br /> maintenance documents must be received by the District when maintenance and operation of <br /> ' the system is accepted by the local governmental entity . Failure to submit the <br /> appropriate final documents referenced in this paragraph will result in the permittee <br /> remaining liable for carrying out maintenance and operation of the permitted system . <br /> 9 . Each phase or independent portion of the permitted system must be completed in accordance <br /> with the permitted plans and permit conditions prior to the initiation of the permitted <br /> use of site infrastructure located within the area served by the portion or phase of the <br /> system . Each phase or independent portion of the system must be completed in accordance <br /> with the permitted plans and permit conditions prior to transfer of responsibility for <br /> ' operation and maintenance of that phase or portion of the system to local government or <br /> other responsible entity . <br /> ' 10 . Within 30 days after completion of construction of the permitted system , or independent <br /> portion of the system , the permittee shall submit a written statement of completion and <br /> certification by a registered professional engineer or other appropriate individual as <br /> authorized by law , utilizing As Built Certification Form 40C- 1 . 181 ( 13) or 40C- 1 . 181 ( 14) <br /> supplied with this permit . When the completed system differs substantially from the <br /> ' permitted plans , any substantial deviations shall be noted and explained and two copies <br /> of as-built drawings submitted to the District. Submittal of the completed from shall <br /> serve to notify the District that the system is ready for inspection . The statement of <br /> completion and certification shall be based on on -site observation of construction <br />