Laserfiche WebLink
(conducted by the registered professional engineer, or other appropriate individual as <br /> authorized by law , or under his or her direct supervision ) or review of as-built drawings <br /> ' for the purpose of determining if the work was completed in compliance with approved <br /> plans and specifications. As-built drawings shall be the permitted drawings revised to <br /> ' reflect any changes made during construction . Both the original and any revised <br /> specifications must be clearly shown . The plans must be clearly labeled as " as-built" or <br /> " record " drawing . All surveyed dimensions and elevations shall be certified by a <br /> ' registered surveyor. The following information , at a minimum , shall be verified on the <br /> as-built drawings : <br /> ' 1 . Dimensions and elevations of all discharge structures including all weirs , slots , <br /> gates , pumps , pipes , and oil and grease skimmers ; <br /> 2 . Locations , dimensions , and elevations of all filter, exfiltration , or underdrain <br /> systems including cleanouts , pipes , connections to control structures , and points of <br /> discharge to the receiving waters ; <br /> 3 . Dimensions , elevations , contours , or cross-sections of all treatment storage areas <br /> sufficient to determine state-storage relationships of the storage area and the permanent <br /> pool depth and volume below the control elevation for normally wet systems , when <br /> appropriate ; <br /> ' 4 . Dimensions , elevations , contours , final grades , or cross-sections of the system to <br /> determine flow directions and conveyance of runoff to the treatment system ; <br /> 5 . Dimensions , elevations , contours , final grades , or cross-sections of all conveyance <br /> systems utilized to convey off-site runoff around the system ; <br /> 6 . Existing water elevation (s) and the date determined ; and Elevation and location of <br /> benchmark(s) for the survey. <br /> ' 11 . The operation phase of this permit shall not become effective until the permittee has <br /> complied with the requirements of general condition 9 above , the District determines the <br /> ' system to be in compliance with the permitted plans , and the entity approved by the <br /> District in accordance with subsections 7 . 1 . 1 through 7 . 1 . 4 of the Applicant' s Handbook : <br /> Management and Storage of Surface Waters , accepts responsibility for operation and <br /> ' maintenance of the system . The permit may not be transferred to such an approved <br /> operation and maintenance entity until the operation phase of the permit becomes <br /> ' effective . Following inspection and approval of the permitted system by the District, <br /> the permittee shall request transfer of the permit to the responsible approved operation <br />