My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOARD OF COUNTY COMMISSIONERS <br /> ' 1840 25th Street, Vero Beach, Florida 32960-3365 <br /> �� co <br /> r 4 � <br /> Telephone: ( 561 ) 567-8000 <br /> ' 101' 10/01 <br /> APPLICANT : <br /> MICHELLE GENTILE <br /> IRC ENGINEERING DIVISION <br /> ' 1840 25TH ST <br /> VERO BEACH , FL 32960 <br /> INDIAN RIVER COUNTY LAND CLEARING PERMIT <br /> ' PROJECT NO ./PER-MIT NO . 2000110077 / 25479 <br /> PROJECT NAME : GENTILE, MICHELLE <br /> PROJECT DESCRIPTION : WETLANDS RESOURCE PERVIT <br /> LAND/TREE CLEARING <br /> PROPERTY OWNER' S NAME : TIIFSTATE OF FLORIDA (1/2) <br /> LOCATION OF ACTIVITY : JUNGLE TRAIL <br /> PARCEL NUMBER: 26-31-3940000-0100-00001. 0 <br /> THIS LAND CLEARING PERMIT is issued in accordance with Chapter 927 of the Indian River County Land Development Ccde . <br /> The above named applicant is hereby authorized to perform the herein described activity in accordance with the specifications sta:_d <br /> ' herein and provided for in Chapter 927 . This permit does not absolve the applicant andlor property owner from the responsibilir, <br /> :o <br /> satisfy state or federal regulations that may apply to the activity. <br /> 1 . LAND CLEARING IS NOT ALLOWED TO COMMENCE UNTIL APPROVAL (OR EXEMPTION VERIFICATION) IS <br /> OBTAINED FROM THE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT (SJRWMD). If you are not sure as to the <br /> status of SJRWMD approval or exemption, contact the Palm Bay office of the SJRWMD at phone number (321 ) 9844940 . <br /> 2 . LAND CLEARING ASSOCLXTED WITH SITE PLAN DEVELOPMENT (per County Code Chapter 914) OR SUBDIVISION <br /> PLATTING ( per County Code Chapter 913 ) IS NOT ALLOWED TO COMMENCE UNTIL THE SITE PLAN OR <br /> PRELIMINARY PLAT IS FORMALLY APPROVED AND , IF A LAND DEVELOPMENT PERMIT IS REQUIRED , UNTIL A <br /> LAND DEVELOPMENT PERMIT IS ISSUED BY THE COUNTY ENGINEERING DIVISION. <br /> 3 . The applicant and/or the person to perform the land clearing shall arrange afield meeting with county environmental planning <br /> staff to review the proposed activity prior to clearing commencement, unless specifically notified that a field conference is not <br /> ' necessary. A copy of the permit shall be kept on-site during the land clearing activity . <br /> 4 . The applicant shall notify county environmental planning staff upon completion of the activity , who shall inspect the property tc <br /> ' confirm compliance which applicable county regulations . <br /> 5 . Debris resulting from the land clearing activity shall be disposed of at an approved disposal facility within 60 days of clearing <br /> completion, or burned with an air curtain incinerator burn permit from the County Fire Division (or State Division of Forestry , as <br /> ' applicable) , in accordance with County Code Chapter 925 . <br /> 6 . This land clearing permit requires that the subject property's pre -development storm water run-off discharge rate not be exceeded <br /> after the clearing operation is completed . This may require construction of temporary detention ponds or berms , and installation of <br /> erosion control devices , such as silt screens and or hay bales, in order to maintain pre -development drainage flow characteristics <br />a:-- d <br /> to protect against sedimentation and turbidity in discharge waters . All drainage and erosion control measures required on the <br /> approved project site plan . as applicable, are in effect for this permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.