Laserfiche WebLink
s thereof in make <br /> 0 05 . a Claim therefor as provided in paragraph <br /> Work or to modify the terms and condition <br /> ' one or more of the following ways : (i) a Written <br /> Amendment; (ii) a Change Order; or (iii) a Work B Upon reasonable written request, OWNER <br /> Change Directive . shall furnish CONTRACTOR with a current statement <br /> B . The requirements of the Contract Documents <br /> upon record of hi h legal <br /> thee and Workislegal todescription <br /> performedlands <br /> and <br /> ' be supplemented , and minor variations b o <br /> may P OWNER' s interest therein as necessary for gluing <br /> deviations in the Work may be authorized , by one () notice of or filing a mechanic's or construction <br /> lien <br /> more of the following ways : (i) a Field Order; II against such lands in accordance with applicable <br /> ENGINEER's approval of a Shop Drawing or Sample; <br /> or (iii ) ENGINEER's written interpretation or clarifi- Laws and Regulations . <br /> cation . C . CONTRACTOR shall provide for all additional <br /> ' 3 . 05 Reuse of Documents lands and access thereto that may be required for <br /> temporary construction facilities or storage of <br /> A. CONTRACTOR and any Subcontractor or materials and equipment. <br /> Supplier or other individual or entity performing or 4 02 Subsurface and Physical Conditions <br /> furnishing any of the Work under a direct or indirect <br /> contract with OWNER: (i) shall not have or acquire A. Reports and Drawings: The Supplementary <br /> any title to or ownership rights in any of the Drawings , Conditions identify: <br /> Specifications , or other documents (or copies of any <br /> thereof) prepared by or bearing the seal of 1 , those reports of explorations and <br /> ' ENGINEER or ENGINEER's Consultant, including tests of subsurface conditions at or contiguous <br /> electronic media editions ; and (ii) shall not reuse any to the Site that ENGINEER has used in <br /> of such Drawings , Specifications , other documents , or preparing the Contract Documents ; and <br /> copies thereof on extensions of the Project or any Pre P h <br /> other project without written consent of OWNER and 2 those drawings of physical <br /> ENGINEER and specific written verification or conditions in or relating to existing surface or <br /> adaption by ENGINEER. This prohibition will survive subsurface structures at or contiguous to the <br /> final payment, completion , and acceptance of the Site except Underground Facilities) that ENGI- <br /> ' Work , _ or termination or completion of the Contract. NEER has used in preparing the Contract <br /> Nothing herein shall preclude CONTRACTOR from Documents .retaining copies of the Contract Documents for record <br /> purposes . B . Limited Reliance by CONTRACTOR on <br /> ARTICLE 4 - AVAILABILITY OF LANDS ; Technical Data Authorized: CONTRACTOR may rely <br /> SUBSURFACE AND PHYSICAL CONDITIONS ; upon the general accuracy of the "technical data" <br /> ' REFERENCE POINTS contained in such reports and drawings , <br /> but such <br /> reports and drawings are not Contract Documents . <br /> Such "technical data" is identified in the Supplementa- <br /> ry Conditions . Except for such reliance on such <br /> ' "technical data ," CONTRACTOR may not rely upon or <br /> 4 .01 Availability of Lands make any Claim against OWNER, ENGINEER, or any <br /> A. OWNER shall furnish the Site . OWNER shall of ENGINEER's Consultants with respect to: <br /> notify CONTRACTOR of any encumbrances or <br /> 1 . the completeness of such reports <br /> restrictions not of general application but specifically and drawings for CONTRACTOR' s purposes , <br /> related to use of the Site with which CONTRACTOR including , but not limited to , any aspects of the <br /> must comply in performing the Work . OWNER will means , methods , techniques , sequences , and <br /> obtain in a timely manner and pay for easements for <br /> ermanent structures or permanent changes in procedures of construction to be employed by <br /> p CONTRACTOR, and safety precautions and <br /> existing facilities . If CONTRACTOR and OWNER are' incident thereto ; or unable to agree <br /> on entitlement to or on the amount or programs <br /> extent, if any, of any adjustment in the Contract Price 2 other data , interpretations , opinions , <br /> or Contract Times , or both , as a result of any delay in and information contained in such reports <br /> or <br /> OWNER' s furnishing the Site , CONTRACTOR may shown or indicated in such drawings ; or <br /> 00700- 12 <br /> 0386- 00700 - General Conditions <br /> ' F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General <br /> Conditions .doc <br />