My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of, or time required for , performance of the <br /> ' 3 , any CONTRACTOR interpretation of <br /> Work; subject, however, to the following : <br /> or conclusion drawn from any "technical data <br /> a . such condition must meet any one or <br /> or any such other data , interpretations , more of the categories described in para- <br /> opinions , or information . graph 4 .03 .A; and <br /> 4 .03 Differing Subsurface or Physical Conditions b , with respect to Work that is paid for <br /> on a Unit Price Basis , any adjustment in <br /> ' A. Notice: If CONTRACTOR believes that any Contract Price will be subject to the <br /> subsurface or physical condition at or contiguous to provisions of paragraphs 9 .08 and 11 .03 . <br /> the Site that is uncovered or revealed either: <br /> 1 . is of such a nature as to establish 2 . CONTRACTOR shall not be entitled <br /> ' to any adjustment in the Contract Price or <br /> that any "technical data" on which CONTRAC- Contract Times if: <br /> TOR is entitled to rely as provided in paragraph <br /> 4 .02 is materially inaccurate; or a . CONTRACTOR knew of the <br /> 2 . is of such a nature as to require a existence of such conditions at the time <br /> CONTRACTOR made a final commitment <br /> change in the Contract Documents ; or to OWNER in respect of Contract Price and <br /> ' 3 . differs materially from that shown or Contract Times by the submission of a Bid <br /> or becoming bound under a negotiated <br /> indicated in the Contract Documents; or contract; or <br /> r4 . is of an unusual nature , and differs b , the existence of such condition could <br /> materially from conditions ordinarily reasonably have been discovered or <br /> encountered and generally recognized as inher- revealed as a result of any examination , <br /> ' ent in work of the character provided for in the investigation , exploration , test, or study of <br /> Contract Documents ; the Site and contiguous areas required by <br /> after becoming the Bidding Requirements or Contract <br /> then CONTRACTOR shall , promptly Documents to beconducted oby or f CTOR 's <br /> r COW <br /> aware thereof and before further disturbing the TRACTOR prior <br /> subsurface or physical conditions or performing any making such final commitment; or <br /> Work in connection therewith (except in an emergency <br /> ' as required by paragraph 6 . 16 .A) , notify OWNER and c, CONTRACTOR failed to give the <br /> ENGINEER in writing about such condition . written notice within the time and as re- <br /> CONTRACTOR shall not further disturb such quired by paragraph 4 .03 .A. <br /> condition or perform any Work in connection therewith <br /> (except as aforesaid) until receipt of written order to do 3 , If OWNER and CONTRACTOR are <br /> so . unable to agree on entitlement to or on the <br /> amount or extent, if any, of any adjustment in <br /> ' B . EN required <br /> 's Review: After receipt of written the Contract Price or Contract Times , or both , a <br /> notice as required by paragraph 4 .03 .A, ENGINEER <br /> tl review the pertinent condition , determine Claim may be made therefor as provided in <br /> will promptly paragraph <br /> 10 .05 . However, OWNER, <br /> the necessity of OWNER's obtaining additional ENGINEER, and ENGINEER's Consultants <br /> ' exploration or tests with respect thereto , and advise shall not be liable to CONTRACTOR for any <br /> OWNER in writing (with a copy to CONTRACTOR) of <br /> claims , costs , losses , or damages (including <br /> ENGINEER's findings and conclusions . but not limited to all fees and charges of <br /> ' and other <br /> engineers , architects , attorneys , <br /> C . Possible Price and Times Adjustments professionals and all court or arbitration or other <br /> 1 , The Contract Price or the Contract dispute resolution costs) sustained by <br /> CONTRACTOR on or in connection with any <br /> ' Times , or both , will be equitably adjusted to the other projector anticipated project, <br /> extent that the existence of such differing <br /> subsurface or physical condition causes an in- <br /> crease or decrease in CONTRACTOR's cost <br /> 00700- 13 <br /> 0386- 00700 - General Conditions <br /> ' F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General <br /> Conditions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.