the party who was required to provide such coverage ,
<br /> 6 .02 Labor; Working Hours
<br /> ' and a Change Order shall be issued to adjust the A. CONTRACTOR shall provide competent,
<br /> Contract Price accordingly, suitably qualified personnel to survey, lay out, and
<br /> 5 . 10 Partial Utilization, Acknowledgment of construct the Work as required by the Contract Docu-
<br /> ments . CONTRACTOR shall at all times maintain
<br /> Property Insurer good discipline and order at the Site .
<br /> A. If OWNER finds it necessary to occupy or use B Except as otherwise required for the safety or
<br /> ' a portion or portions of the Work prior to Substantial rotection of persons or the Work or property at
<br /> the
<br /> Completion of all the Work as provided in paragraph Site or adjacent thereto , and except as otherwise
<br /> 14 .05 , no such use or occupancy shall commence nce stated in the Contract Documents , all Work at the Site
<br /> before the insurers providing the property i shall be erformed during regular working hours , and
<br /> pursuant to paragraph 5 .06 have acknowledged notice CONTRACTOR will not permit overtime work or the
<br /> thereof and in writing effected any changes in cover- erformance of Work on Saturday, Sunday, or any
<br /> age necessitated thereby. The insurers providing the legal holiday without OWNER's written consent (which
<br /> property insurance shall consent by endorsement on 9 y
<br /> ' the policy or policies , but the property insurance shall
<br /> f written notice nreasENonably withheld ) given after prior
<br /> not be canceled or permitted to lapse on account
<br /> any such partial use or occupancy.
<br /> 6 .03 Services, Materials, and Equipment
<br /> ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES A, Unless otherwise specified in the General Re-
<br /> quirements , CONTRACTOR shall provide and
<br /> 6 . 01 Supervision and Superintendence assume full responsibility for all services ,
<br /> materials
<br /> equipment, labor, transportation , construction
<br /> liances , fuel ,
<br /> A. CONTRACTOR shall supervise , inspect, and ernlight heatent and , water, sanitary facilities ,
<br /> achinery, tools , app
<br /> direct the Work competently and efficiently, devoting power,
<br /> such attention thereto and applying such skills and temporary facilities , and all other facilities and
<br /> incidentals necessary for the performance , testing ,
<br /> expertise as may be necessary to perform the Work in start-u , and completion of the Work .
<br /> accordance with the Contract Documents . CON- P
<br /> TRACTOR shall be solely responsible for the means , B All materials and equipment incorporated into
<br /> methods , techniques , sequences , and procedures of the Work shall be as specified or, if not specified , shall
<br /> construction , but CONTRACTOR shall not belity and new, except as otherwise qua
<br /> responsible for the negligence of OWNER or be of intheCont act Documents . All warranties
<br /> ENGINEER in the design or specification of a specific provided
<br /> means , method , technique , sequence , or procedure of and
<br /> shall expressly run to called
<br /> benefit o OWNER,
<br /> r construction which is shown or indicated in and re wired b ENGINEER, CONTRACTOR shall furnish
<br /> expressly required by the Contract Documents . CON - q y
<br /> TRACTOR shall be responsible to s the Contract test) asory to the sou ce , kind , landrquafty f materials
<br /> completed Work complies accurately withand equipment. All materials and equipment shall be
<br /> Documents . stored , applied , installed , connected , erected ,
<br /> B . At all times during the progress of the Work, protected , used , cleaned , and conditioned in
<br /> CONTRACTOR shall assign a competent resident
<br /> superintendent thereto who shall not be replaced Su°PP�aern except as othwith erwisemays of tapplicablehe
<br /> may be provided in
<br /> the
<br /> without written notice to OWNER and ENGINEER
<br /> Contract Documents .
<br /> except under extraordinary circumstances . The 6 . 04 Progress Schedule
<br /> R
<br /> superintendent will be CONTRACTORS
<br /> representative at the Site and shall have authority to A. CONTRACTOR shall adhere to the progress
<br /> act on behalf of CONTRACTOR. All communications in
<br /> given to or received from the superintendent shall be 207dase iestablished
<br /> sm ysbedadjusted accordance
<br /> to timeas
<br /> ' binding on CONTRACTOR .
<br /> provided below.
<br /> 00700-20
<br /> 0386- 00700 - General Conditions
<br /> FAEngineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General
<br /> Conditions .doc
<br />
|