t1 . CONTRACTOR shall submit to the design concept of the completed Project <br /> ENGINEER for acceptance (to the extent indi- as a functioning whole, and ; <br /> ' cated in paragraph 2 . 07 ) proposed adjustments <br /> in the progress schedule that will not result in b . CONTRACTOR certifies that: (i ) <br /> changing the Contract Times (or Milestones ) . there is no increase in cost to the OWNER; <br /> Such adjustments will conform generally to the and (ii) it will conform substantially, even <br /> progress schedule then in effect and additional- with deviations , to the detailed requirements <br /> ly will comply with any provisions of the General of the item named in the Contract <br /> Requirements applicable thereto . Documents . <br /> ' 2 . Proposed adjustments in the 2 . Substitute Items <br /> progress schedule that will change the Contract <br /> Times (or Milestones ) shall be submitted in a . If in ENGINEER's sole discretion an <br /> ' accordance with the requirements of Article 12 , item of material or equipment proposed by <br /> Such adjustments may only be made by a CONTRACTOR does not qualify as an <br /> Change Order or Written Amendment in accor- "or-equal" item under paragraph 6 .05 .A. 1 , it <br /> ' dance with Article 12 . will be considered a proposed substitute <br /> item . <br /> 6 . 05 Substitutes and "Or-Equals " <br /> b . CONTRACTOR shall submit suffi- <br /> A. Whenever an item of material or equipment is cient information as provided below to allow <br /> specified or described in the Contract Documents by ENGINEER to determine that the item of <br /> using the name of a proprietary item or the name of a material or equipment proposed is <br /> particular Supplier, the specification or description is essentially equivalent to that named and an <br /> intended to establish the type , function , appearance , acceptable substitute therefor. Requests for <br /> and quality required . Unless the specification or review of proposed substitute items of <br /> description contains or is followed by words reading material or equipment will not be accepted <br /> that no like , equivalent, or "or-equal" item or no by ENGINEER from anyone other than <br /> substitution is permitted , other items of material or CONTRACTOR. <br /> equipment or material or equipment of other Suppliers <br /> may be submitted to ENGINEER for review under the c. The procedure for review by ENGI- <br /> circumstances described below. NEER will be as set forth in paragraph <br /> 6 .05 .A.2 . d , as supplemented in the General <br /> 1 . "Or-Equal" Items: If in ENGINEER's Requirements and as ENGINEER may <br /> ' sole discretion an item of material or equipment decide is appropriate under the <br /> proposed by CONTRACTOR is functionally circumstances . <br /> equal to that named and sufficiently similar so <br /> that no change in related Work will be required , d . CONTRACTOR shall first make <br /> it may be considered by ENGINEER as an written application to ENGINEER for review <br /> "or-equal" item , in which case review and of a proposed substitute item of material or <br /> approval of the proposed item may, in equipment that CONTRACTOR seeks to <br /> ' ENGINEER's sole discretion , be accomplished furnish or use . The application shall certify <br /> without compliance with some or all of the that the proposed substitute item will <br /> requirements for approval of proposed substi- perform adequately the functions and <br /> tute items . For the purposes of this paragraph achieve the results called for by the general <br /> 6 .05 .A. 1 , a proposed item of material or design , be similar in substance to that <br /> equipment will be considered functionally equal specified , and be suited to the same use as <br /> to an item so named if: that specified . The application will state the <br /> extent, if any, to which the use of the pro- <br /> a , in the exercise of reasonable posed substitute item will prejudice <br /> judgment ENGINEER determines that: (i ) it CONTRACTOR's achievement of Substan- <br /> is at least equal in quality, durability, tial Completion on time , whether or not use <br /> appearance , strength , and design of the proposed substitute item in the Work <br /> characteristics ; (ii ) it will reliably perform at will require a change in any of the Contract <br /> least equally well the function imposed by Documents (or in the provisions of any other <br /> direct contract with OWNER for work on the <br /> 00700-21 <br /> 0386- 00700 - General Conditions <br /> F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General <br /> Conditions .doc <br />