' expressly required by applicable Laws and 2 . Should any claim be made by any
<br /> Regulations , neither OWNER nor ENGINEER shall be such owner or occupant because of the
<br /> ' responsible for monitoring CONTRACTOR's compli- performance of the Work , CONTRACTOR shall
<br /> ance with any Laws or Regulations . promptly settle with such other party by
<br /> negotiation or otherwise resolve the claim by
<br /> ' B . If CONTRACTOR performs any Work know- arbitration or other dispute resolution
<br /> ing or having reason to know that it is contrary to Laws proceeding or at law.
<br /> or Regulations , CONTRACTOR shall bear all claims ,
<br /> costs , losses , and damages ( including but not limited 3 . To the fullest extent permitted by
<br /> to all fees and charges of engineers , architects , Laws and Regulations , CONTRACTOR shall
<br /> attorneys , and other professionals and all court or indemnify and hold harmless OWNER,
<br /> arbitration or other dispute resolution costs ) arising out ENGINEER, ENGINEER's Consultant, and the
<br /> of or relating to such Work ; however, it shall not be officers , directors , partners , employees , agents ,
<br /> ' CONTRACTOR's primary responsibility to make and other consultants of each and any of them
<br /> certain that the Specifications and Drawings are in from and against all claims , costs , losses , and
<br /> accordance with Laws and Regulations , but this shall damages (including but not limited to all fees
<br /> not relieve CONTRACTOR of CONTRACTOR Is and charges of engineers , architects , attorneys ,
<br /> obligations under paragraph 3 . 03 . and other professionals and all court or
<br /> arbitration or other dispute resolution costs)
<br /> C . Changes in Laws or Regulations not known at arising out of or relating to any claim or action ,
<br /> the time of opening of Bids (or, on the Effective Date legal or equitable , brought by any such owner
<br /> of the Agreement if there were no Bids ) having an or occupant against OWNER, ENGINEER, or
<br /> effect on the cost or time of performance of the Work any other party indemnified hereunder to the
<br /> may be the subject of an adjustment in Contract Price extent caused by or based upon
<br /> or Contract Times , If OWNER and CONTRACTOR CONTRACTOR's performance of the Work.
<br /> are unable to agree on entitlement to or on the
<br /> amount or extent, if any, of any such adjustment, a B . Removal of Debris During Performance of the
<br /> Claim may made therefor as provided in paragraph Work: During the progress of the Work CONTRAC-
<br /> 10 .05 . TOR shall keep the Site and other areas free from
<br /> accumulations of waste materials , rubbish , and other
<br /> 6 . 10 Taxes debris . Removal and disposal of such waste materi-
<br /> als , rubbish , and other debris shall conform to applica-
<br /> A. CONTRACTOR shall pay all sales , consum - ble Laws and Regulations .
<br /> er, use, and other similar taxes required to be paid by
<br /> CONTRACTOR in accordance with the Laws and C . Cleaning: Prior to Substantial Completion of
<br /> Regulations of the place of the Project which are the Work CONTRACTOR shall clean the Site
<br /> and
<br /> applicable during the performance of the Work . make it ready for utilization by OWNER. At the com-
<br /> pletion of the Work CONTRACTOR shall remove from
<br /> 6 . 11 Use of Site and Other Areas the Site all tools , appliances , construction equipment
<br /> and machinery, and surplus materials and shall
<br /> A. Limitation on Use of Site and Other Areas restore to original condition all property not designated
<br /> for alteration by the Contract Documents .
<br /> 1 . CONTRACTOR shall confine
<br /> construction equipment, the storage of D . Loading Structures: CONTRACTOR shall not
<br /> ' materials and equipment, and the operations of load nor permit any part of any structure to be loaded
<br /> workers to the Site and other areas permitted in any manner that will endanger the structure,
<br /> nor
<br /> by Laws and Regulations , and shall not shall CONTRACTOR subject any part of the Work or
<br /> unreasonably encumber the Site and other adjacent property to stresses or pressures that will
<br /> areas with construction equipment or other endanger it.
<br /> materials or equipment. CONTRACTOR shall
<br /> assume full responsibility for any damage to 6 . 12 Record Documents
<br /> any such land or area , or to the owner or
<br /> occupant thereof, or of any adjacent land or A. CONTRACTOR shall maintain in a safe place
<br /> areas resulting from the performance of the at the Site one record copy of all Drawings , Specifica-
<br /> Work . tions , Addenda , Written Amendments , Change
<br /> Orders , Work Change Directives , Field Orders , and
<br /> 00700-24
<br /> 0386- 00700 - General Conditions
<br /> ' F:\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General
<br /> Conditions .doc
<br />
|