order
<br /> indirectly, in whole or in part, to the fault or negligence
<br /> written interpretations and clarifications in good
<br /> Supplier, or
<br /> and annotated to show changes mo e during
<br /> h other indivof vidual or ntity directly or indirectly employed
<br /> ' construction . These record documents9with
<br /> of them ) . CONTRACTOR's duties and
<br /> all approved Samples and a counterpart of all by an Y
<br /> approved Shop Drawings will be available to ENGI- Work shalltc
<br /> these record documents , Samples , ontinue until s ies for safety ch time as all the Work s
<br /> ' NEER for reference . Upon completion of nd Shp completed and ENGINEER has issued a notice to
<br /> NER
<br /> nd
<br /> or
<br /> nce with
<br /> Drawings will be delivered to ENGINEER for OWNER. paragraph ar g apha 4 .07 gN thatC the in
<br /> ithe accept acceptable
<br /> ' 6 . 13 Safety and Protection (except as otherwise expressly provided in connection
<br /> with Substantial Completion) ,
<br /> A. CONTRACTOR shall be solely responsible' 61
<br /> 4 Safety Representative for initiating , maintaining and supervising all safety
<br /> precautions and programs in connection with the A. CONTRACTOR shall designate a qualified
<br /> Work . CONTRACTOR shall take all necessary and
<br /> precautions for the safety of, and shall provide loss whosed
<br /> uties
<br /> a and feresponsibilitiestivtS
<br /> theshall he the
<br /> ' necessary protection to prevent damage , injury prevention of accidents and the maintaining and
<br /> to : supervising of safety precautions and programs .
<br /> ' 1 , all persons on the Site or who may 6 . 15 Hazard Communication Programs
<br /> be affected by the Work;
<br /> 2 . all the Work and materials and equip- A. CONTRACTOR shall be responsible for
<br /> ment to be incorporated therein , whether in sheets or other hazard exchangecoordinating any communication
<br /> information
<br /> f Site
<br /> h
<br /> storage on or off the ; and
<br /> 9 required to be made available to or exchanged be-
<br /> at the Site or adjacent be-
<br /> tween or among employers at the Site in accordance
<br /> ' 3 , other property
<br /> thereto , including trees , shrubs , lawns , walks , with Laws or Regulations ,
<br /> pavements , roadways , structures , utilities , and
<br /> Underground Facilities not designated for 6 . 16 Emergencies
<br /> ' removal , relocation , or replacement in the A. In emergencies affecting the safety or protec-
<br /> course of construction . tion of persons or the Work or property at the Site or
<br /> B . CONTRACTOR shall comply with all applica- adjacent thereto, CONTRACTOR is obligatedprevent
<br /> acct so
<br /> ble Laws and Regulations relating to the safety of prevent threatened damage , injury,prompt written
<br /> persons or property, or to the protection of persons or CONTRACTOR shall give ENGINEER anysignificant
<br /> property from damage , injury, or loss ; and shall erect noticechangif CnO T Work or RAC believes
<br /> liations from he ICont act
<br /> ' and maintain all necessary safeguards for such safety
<br /> ments have been caused thereby or are
<br /> and protection . CONTRACTOR shall notify owners of D a result thereof. if ENGINEER determines that a
<br /> adjacent property and of Underground Faents is in the
<br /> cilities andother utility owners when prosecution i h themhe in nnay the causes of he action taken uby
<br /> CONTRACTORinn
<br /> affect them , and shall cooperatech an
<br /> protection , removal , relocation , and replacement
<br /> any D rpon a or Change Order�wilgl be ssued .Work Change
<br /> their property. All damage , Injury,
<br /> or loss' property referred to in paragraph 6 . 13 .A.2 or 6 . 13 .A.3 6 17 Shop Drawings and
<br />Samples
<br /> caused , directly or indirectly, in whole or in part, by
<br /> CONTRACTOR, any Subcontractor, Supplier, or any A. CONTRACTOR shall submit Shop Drawings
<br /> other individual or entity directly or indirectly employed approval in accordance
<br /> ' by any of them to perform
<br /> any of the
<br /> hbe liable ,o shall one be withto the acceptable ptable schedule oER for review and Shop Drawings
<br /> and
<br /> for whose acts any o Yle submittals . All submittals will be identified as
<br /> remedied by CONTRACTOR (except damage or loss Sample re uire and in the number of copies
<br /> attributable to the fault of Drawings or Specifications ENGINEER may q
<br /> or to the acts or omissions of OWNER or ENGINEER specified in the GeneDrawings
<br /> �a�ReSu;INre betcomplete data
<br /> or ENGINEER's Consultant, or anyone employed by
<br /> shown on the Shop g specified perfor-
<br /> any of them , or anyone f t whose a attributable , any directly themcts of respect
<br /> mance tand design to lcriteria , materials , and similar data
<br /> may be liable , and not
<br /> 00700-25
<br /> 0386- 00700 - General Conditions
<br /> ' F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General
<br /> Conditions .doc
<br />
|