Laserfiche WebLink
' to show ENGINEER the services , materials , and 2 . Each submittal shall bear a stamp or <br /> equipment CONTRACTOR proposes to provide and specific written indication that CONTRACTOR <br /> ' to enable ENGINEER to review the information for the has satisfied CONTRACTOR's obligations <br /> limited purposes required by paragraph 6 . 17 . E . under the Contract Documents with respect to <br /> CONTRACTOR's review and approval of that <br /> B . CONTRACTOR shall also submit Samples to submittal . - <br /> ENGINEER for review and approval in accordance <br /> with the acceptable . schedule of Shop Drawings and 3 . At the time of each submittal , CON <br /> Sample submittals . Each Sample will be identified TRACTOR shall give ENGINEER specific <br /> ' clearly as to material , Supplier, pertinent data such as written notice of such variations , if any, that the <br /> catalog numbers , and the use for which intended and Shop Drawing or Sample submitted may have <br /> otherwise as ENGINEER may require to enable ENGI- from the requirements of the Contract <br /> NEER to review the submittal for the limited purposes Documents , such notice to be in a written com- <br /> ' required by paragraph 6 . 17 . E . The numbers of each munication separate from the submittal ; and , in <br /> Sample to be submitted will be as specified in the addition , shall cause a specific notation <br /> to be <br /> Specifications . made on each Shop Drawing and Sample sub- <br /> mitted to ENGINEER for review and approval of <br /> C . Where a Shop Drawing or Sample is required each such variation . <br /> by the Contract Documents or the schedule of Shop <br /> Drawings and Sample submittals acceptable to ENGI- E . ENGINEER 's Review <br /> NEER as required by paragraph 2 .07 , any related <br /> Work performed prior to ENGINEER's review and 1 . ENGINEER will timely review and <br /> approval of the pertinent submittal will be at the sole approve Shop Drawings and Samples in <br /> expense and responsibility of CONTRACTOR. accordance with the schedule of Shop <br /> Drawings and Sample submittals acceptable to <br /> D . Submittal Procedures ENGINEER. ENGINEER's review and <br /> approval will be only to determine if the items <br /> ' 1 . Before submitting each Shop covered by the submittals will , after installation <br /> Drawing or Sample , CONTRACTOR shall have or incorporation in the Work , conform to the <br /> determined and verified : information given in the Contract Documents <br /> ' and be compatible with the design concept of <br /> a . all field measurements , quantities , the completed Project as a functioning whole as <br /> dimensions , specified performance criteria , indicated by the Contract Documents . <br /> installation requirements , materials , catalog <br /> numbers , and similar information with 2 . ENGINEER's review and approval <br /> respect thereto ; will not extend to means , methods , techniques , <br /> sequences , or procedures of construction <br /> ' b , all materials with respect to intended (except where a particular means , method , <br /> use , fabrication , shipping , handling , storage , technique, sequence , or procedure of con- <br /> assembly, and installation pertaining to the struction is specifically and expressly called for <br /> performance of the Work; by the Contract Documents) or to safety <br /> precautions or programs incident thereto . The <br /> c. all information relative to means , review and approval of a separate item as such <br /> methods , techniques , sequences , and will not indicate approval of the assembly in <br /> procedures of construction and safety which the item functions . <br /> precautions and programs incident thereto ; <br /> and 3 . ENGINEER's review and approval of <br /> Shop Drawings or Samples shall not relieve <br /> ' d . CONTRACTOR shall also have CONTRACTOR from responsibility for any <br /> reviewed and coordinated each Shop variation from the requirements of the Contract <br /> Drawing or Sample with other Shop Documents unless CONTRACTOR has in <br /> Drawings. and Samples and with the writing called ENGINEER's attention to each <br /> ' requirements of the Work and the Contract such variation at the time of each submittal as <br /> Documents . required by paragraph 6 . 17 . D .3 and ENGI- <br /> NEER has given written approval of each such <br /> variation by specific written notation thereof <br /> 00700-26 <br /> 0386- 00700 - General Conditions <br /> ' F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General <br /> Conditions . doc <br />